WELL · 42-433-32952 · DISTRICT 7

Bullard Mary #2

N

Stonewall County · Aspermont West (Tannehill) field  · Vertical

Bullard Mary #2 (API 42-433-32952) is a well in Stonewall County operated by Clear Fork Incorporated, completed March 22, 1995.

The RRC has issued one drilling permit, issued March 3, 1995, permitted to 3,600 ft.

It was permitted by Sage Energy Company and has since transferred to Clear Fork Incorporated on the wellbore schedule.

Completion filings report 4 formation tops, including Dothan, Noodle Creek, Tannehill, Stockwether.

Its 2 leases have reported 151K barrels of oil and 20.7K mcf of gas since January 1995, last reporting in July 2026. The leases carry 11 wells, so these are lease totals, not this well alone.

Operator of record

Clear Fork Incorporated

Permitted by Sage Energy Company; the EWA schedule now lists a different operator.

Based in
Abilene, TX
P-5 status
Active (A)
P-5 last filed
Feb 4, 2026
Permits on file
472
Phone
(325) 677-1309

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleClear Fork Incorporated
Production reportsPermex Petroleum Corporationthrough Jan 2024
Latest permitSage Energy CompanyMar 3, 1995

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,600
total depth, ft
1
permits on file
Mar 3, 1995
last permit issued
Mar 22, 1995
completed
151K
cumulative oil, bbl
20.7K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1995 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 22, 1995
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 11 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Mary Bullard Unit O-8-30186Aspermont, West (Tannehill)Permex Petroleum Corporation977.3K797Oct 2008 – Jul 2026
Bullard, Mary O-8-27456Aspermont, West (Tannehill)Clear Fork, Incorporated274.2K19.9KJan 1995 – Feb 2009

Oil, barrels lease total

Last 12 months 0 · prior 12 0

02040202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Sage Energy CompanyJan 1995 → Jul 2007
  2. 2Sheridan Production Company, LLCAug 2007 → Apr 2008
  3. 3Clear Fork, IncorporatedMay 2008 → Jul 2017
  4. 4Permex Petroleum CorporationAug 2017 → Jan 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
433189-99DrillSage Energy CompanyFeb 23, 1995Mar 3, 1995Mar 6, 19953,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-27456————
—— O-8-30186————

Formation tops

As filed on W-2/G-1. Subsea from 1,856 ft elevation.Download CSV →

FormationMD ftSubsea
Dothan3,024-1,168
Noodle Creek3,148-1,292
Tannehill3,204-1,348
Stockwether3,240-1,384

Perforations

Perforated and open-hole intervals.

FromToType
3,2063,213Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62517412.25140 S
5.53,3007.875350 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 18, 2008Mar 28, 1995Yes
00May 11, 1995Mar 28, 1995Yes
00Apr 5, 1995——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
—
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000104161H-1 InjectionNot activated5001,6003,206–3,213

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/43332952, documented in the API reference.