WELL · 42-433-33027 · DISTRICT 7

Smith A.E. B #18

N

Stonewall County · Mengel E. (Canyon Sand) field  · Vertical

Smith A.E. B #18 (API 42-433-33027) is a well in Stonewall County operated by Walter Exploration Inc., completed September 30, 1996.

The RRC has issued one drilling permit (amended once), issued April 8, 1996, permitted to 4,600 ft.

Completion filings report 2 formation tops, including Swastika, Canyon.

Its 2 leases have reported 400K barrels of oil and 107K mcf of gas since May 1994, last reporting in July 2026. The leases carry 22 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit.

Operator of record

Walter Exploration Inc.

Dallas, TX · P-5 Y, filed Sep 14, 2001 · 237 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWalter Exploration Inc.
Production reportsL.C.S. Production Companythrough Apr 2026
Latest permitWalter Exploration Inc.Apr 8, 1996

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,600
total depth, ft
2
permits on file
Apr 8, 1996
last permit issued
Sep 30, 1996
completed
400K
cumulative oil, bbl
107K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 1994 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 30, 1996
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 22 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Smith, Walter Unit O-8-28573Mengel, E. (Canyon Sand)L.C.S. Production Company19369K66.8KDec 1998 – Jul 2026
Smith, A.E. "B" O-8-27189Mengel, E. (Canyon Sand)Walter Exploration Inc.331.4K39.9KMay 1994 – Oct 2004

Oil, barrels lease total

Last 12 months 284 · prior 12 1,120(-75%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Martin Oil Co.May 1994 → Dec 1997
  2. 2Walter Exploration Inc.Jan 1998 → Sep 2001
  3. 3Walter Exploration CompanyOct 2001 → Sep 2013
  4. 4Foundation Energy Management LLCOct 2013 → Nov 2022
  5. 5L.C.S. Production CompanyDec 2022 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
446710-98DrillWalter Exploration Inc.Oct 12, 1998Apr 8, 1996—4,300
446710-99DrillMartin Oil Co.Apr 8, 1996Apr 8, 1996Apr 16, 19964,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-27189————
—— O-8-28573————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Swastika3,700
CanyonCANYON SAND4,230
CanyonCANYON SD.4,230

Perforations

Perforated and open-hole intervals.

FromToType
4,3984,404Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62521012.25140 S
5.54,4757.875565 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 9, 1999Jul 8, 1999—
00Feb 16, 1999Jun 17, 1997Yes
00Nov 6, 1997Jun 17, 1997Yes
00Oct 16, 1997——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
437K
bbl, all reported
Sep 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000088978H-1 InjectionActive5002,0004,398–4,404

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/43333027, documented in the API reference.