WELL · 42-433-33273 · DISTRICT 7
Preston A #1
Stonewall County · Barbee-Reiff (Strawn) field · Vertical
Preston A #1 (API 42-433-33273) is a well in Stonewall County operated by Terrell Oil & Gas Production CO., completed June 4, 2003.
The RRC has issued one drilling permit, issued March 5, 2003, permitted to 6,200 ft.
Completion filings report 3 formation tops, including Top Of Gunsite, Strawn, Caddo.
Its 2 leases have reported 80.7K barrels of oil and 120K mcf of gas since July 2000, last reporting in July 2026. The leases carry 4 wells, so these are lease totals, not this well alone.
Operator of record
Terrell Oil & Gas Production Co.
- Based in
- Hamlin, TX
- P-5 status
- Active (A)
- P-5 last filed
- Jan 16, 2026
- Permits on file
- 72
- Phone
- (325) 576-2751
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Terrell Oil & Gas Production Co. |
| Production reports | Terrell Oil & Gas Production Co.through Oct 2023 |
| Latest permit | Terrell Oil & Gas Production Co.Mar 5, 2003 |
- 6,200
- total depth, ft
- 1
- permits on file
- Mar 5, 2003
- last permit issued
- Jun 4, 2003
- completed
- 80.7K
- cumulative oil, bbl
- 120K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jul 2000 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 4, 2003
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Preston O-8-28866 | Barbee-Reiff (Strawn) | Terrell Oil & Gas Production Co. | 3 | 51.2K | 45.6K | Jul 2000 – Jul 2026 |
| Preston "A" O-8-29256 | Barbee-Reiff (Strawn) | Terrell Oil & Gas Production Co. | 1 | 29.5K | 74.3K | Jun 2003 – Oct 2010 |
Oil, barrels lease total
Last 12 months 0 · prior 12 0
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Terrell Oil & Gas Production Co.Jul 2000 → Oct 2023
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 529096-99 | Drill | Terrell Oil & Gas Production Co. | Mar 3, 2003 | Mar 5, 2003 | Mar 28, 2003 | 6,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-28866 | — | — | — | — |
| — | — O-8-29256 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,733 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,240 | 5,243 | Perforated |
| 5,251 | 5,255 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 181 | 12.25 | 100 S |
| 4.5 | 6,030 | 7.875 | 400 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 13, 2010 | Jun 12, 2003 | Yes |
| 00 | Jul 30, 2003 | Jun 12, 2003 | Yes |
| 00 | Jul 10, 2003 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-433-33273 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-433-33273 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/43333273, documented in the API reference.