WELL · 42-433-33412 · DISTRICT 7

Fuzz (Strawn 5600) Unit #105

Plugged

Stonewall County · Fuzz (Strawn 5600) field  · Vertical

Fuzz (Strawn 5600) Unit #105 (API 42-433-33412) is a plugged well in Stonewall County, plugged July 19, 2019, last operated by Walsh & Watts Inc..

The RRC has issued one drilling permit, issued February 6, 2008, permitted to 5,700 ft.

It was permitted by Ginnings Company and has since transferred to Walsh & Watts Inc. on the wellbore schedule.

Completion filings report 5 formation tops, including Stockwether Lime, Saddle Creek, Baullard Sand, Bullard Sand.

Its lease has reported 718K barrels of oil and 152K mcf of gas since January 1993, last reporting in April 2021. The lease carries 17 wells, so these are lease totals, not this well alone.

Operator of record

Walsh & Watts Inc.

Permitted by Ginnings Company; the EWA schedule now lists a different operator.

Aledo, TX · P-5 Y, filed Sep 4, 2025 · 361 permits on file · (855) 229-2122

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWalsh & Watts Inc.
Production reportsWalsh & Watts, Inc.through Oct 2018
Latest permitGinnings CompanyFeb 6, 2008

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,700
total depth, ft
1
permits on file
Feb 6, 2008
last permit issued
Mar 12, 2008
completed
718K
cumulative oil, bbl
152K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2021

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 12, 2008
Shut in
—
Plugged
Jul 19, 2019

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 17 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Fuzz (Strawn 5600) Unit O-8-24883Fuzz (Strawn 5600)Walsh & Watts, Inc.17718K152KJan 1993 – Apr 2021

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Hunt Oil CompanyJan 1993 → May 2000
  2. 2Ginnings CompanyJun 2000 → Mar 2013
  3. 3Walsh & Watts, Inc.Apr 2013 → Oct 2018

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
653916-99DrillGinnings CompanyJan 24, 2008Feb 6, 2008Feb 10, 20085,700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-24883————

Formation tops

As filed on W-2/G-1. Subsea from 1,770 ft elevation.Download CSV →

FormationMD ftSubsea
Stockwether Lime3,140-1,370
Saddle CreekSADDLE CREEK LIME3,318-1,548
Baullard Sand5,240-3,470
Bullard Sand5,240-3,470
CanyonCANYON LIME5,532-3,762

Perforations

Perforated and open-hole intervals.

FromToType
5,5795,586Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62516112.25125 S
5.55,6507.875625 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 28, 2009May 12, 2008—
00Jun 11, 2009May 12, 2008—
00Dec 18, 2008——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
1.02M
bbl, all reported
Sep 2019
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000098856H-1 InjectionPlugged Aug 26, 20191,5002,0005,520–5,660

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 29,653(-100%)

02K4K6K20182019

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/43333412, documented in the API reference.