TEXAS · WELLS · STONEWALL COUNTY · API 42-433-33862 · DISTRICT 7B

Flowers Canyon Sand Unit #289W

N

Stonewall County  · Vertical

Permitted field
Flowers (Canyon Sand)

Flowers Canyon Sand Unit #289W (API 42-433-33862) is a former disposal or injection well in Stonewall County, last operated by Citation Oil & Gas Corp.; its UIC permit is no longer active.

The RRC has issued one drilling permit, issued December 17, 2012, permitted to 4,700 ft.

Operator of record

Citation Oil & Gas Corp.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
May 27, 2026
Permits on file
866
Phone
(281) 891-1000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitCitation Oil & Gas Corp.Dec 17, 2012
4,700
total depth, ft
1
permits on file
Dec 17, 2012
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
752508-99DrillCitation Oil & Gas Corp.Dec 3, 2012Dec 17, 2012—4,700

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Sep 2016
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000108005H-1 InjectionCanceled Oct 11, 20161,5001,9503,900–4,300

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120152016

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/43333862, documented in the API reference.