TEXAS · WELLS · SUTTON COUNTY · FIELDS 52 LEASE · API 42-435-32292 · DISTRICT 6E
Fields 52 #3
Sutton County · Sawyer (Canyon) field · Vertical
Fields 52 #3 (API 42-435-32292) is a plugged well in Sutton County, plugged July 16, 2010, last operated by Highmount Expl & Prod Texas LLC.
The RRC has issued one drilling permit (amended once), issued December 19, 1979, permitted to 6,300 ft.
It was permitted by American Exploration Company and has since transferred to Highmount Expl & Prod Texas LLC on the wellbore schedule.
Its lease has reported 5.72K mcf of gas since January 1993, with no volume in the three years through April 2026.
Operator of record
Highmount Expl & Prod Texas LLC
Permitted by American Exploration Company; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Sep 4, 2014
- Permits on file
- 1,184
- Phone
- (405) 749-5263
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Highmount Expl & Prod Texas LLC |
| Production reports | Highmount Expl & Prod Texas LLCthrough Dec 1993 |
| Latest permit | American Exploration CompanyDec 19, 1979 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,300
- total depth, ft
- 2
- permits on file
- Dec 19, 1979
- last permit issued
- Jul 21, 1980
- completed
- 0
- cumulative oil, bbl
- 5.72K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Dec 1993
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 21, 1980
- Shut in
- —
- Plugged
- Jul 16, 2010
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Fields 52 G-9-89063 | Sawyer (Canyon) | Highmount Expl & Prod Texas LLC | 1 | 0 | 5.72K | Jan 1993 – Dec 1993 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1American Exploration CompanyJan 1993 → Dec 1993
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 67268-98 | Drill | American Exploration Company | Sep 15, 1992 | Dec 19, 1979 | — | 6,300 |
| 67268-99 | Drill | HNG Oil Company | Dec 19, 1979 | Dec 19, 1979 | Jun 6, 1980 | 6,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jul 21, 1980 | Fields 52 G-9-89063 | Sawyer (Canyon) | Highmount Expl & Prod Texas LLC | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,293 | 5,297 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 7 | 1,022 | 8.75 | 215 S |
| 1.5 | 5,299 | — | — |
| 4.5 | 5,565 | 6.25 | 165 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Aug 18, 1980 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-435-32292 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-435-32292 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/43532292, documented in the API reference.