WELL · 42-435-33123 · DISTRICT 7
Shurley #1 F
Sutton County · Sawyer (Canyon) field · Producing · Vertical
Shurley #1 F (API 42-435-33123) is a well in Sutton County operated by Barron Petroleum LLC, completed June 7, 1984 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued May 1, 1984, permitted to 7,000 ft.
It was permitted by Lively Energy & Development Corp and has since transferred to Barron Petroleum LLC on the wellbore schedule.
Completion filings report 2 formation tops, including Base Cretaceous (marker), Canyon.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Lively Energy & Development Corp; the EWA schedule now lists a different operator.
San Antonio, TX · P-5 Y, filed May 4, 2026 · 30 permits on file · (918) 740-7661
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Barron Petroleum LLC |
| Production reports | Barron Petroleum LLCthrough Oct 2023 |
| Latest permit | Lively Energy & Development CorpMay 1, 1984 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,000
- total depth, ft
- 1
- permits on file
- May 1, 1984
- last permit issued
- Jun 7, 1984
- completed
- 0
- cumulative oil, bbl
- 135K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jun 7, 1984
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Delinquent
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Shurley G-9-111426 | Shurley Ranch (Canyon) | Barron Petroleum LLC | 1 | 0 | 135K | Jan 1993 – Jul 2026 |
Gas, mcf lease total
Last 12 months 0 · prior 12 0
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Lively Energy & Development CorpJan 1993 → Jan 2015
- 2Tidwell Production CompanyJun 2015 → Jun 2018
- 3Bob Hughes Oil Company, LLCJul 2018 → Feb 2019
- 4Barron Petroleum LLCMar 2019 → Oct 2023
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 237308-99 | Drill | Lively Energy & Development Corp | May 1, 1984 | May 1, 1984 | May 24, 1984 | 7,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-9-111426 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,185 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Base Cretaceous (marker)BASE OF CRETACEOUS | 730 | 1,455 |
| Canyon | 6,220 | -4,035 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,792 | 6,086 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,250 | 12.25 | 550 sx |
| 4.5 | 6,608 | 7.875 | 675 sx |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 23, 1984 | Jun 29, 1984 | — |
| 00 | Jul 20, 1984 | Jun 29, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-435-33123 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-435-33123 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/43533123, documented in the API reference.