WELL · 42-435-38206 · DISTRICT 7

Brockman George #7

Plugged

Sutton County · Sawyer (Canyon) field  · Vertical

Brockman George #7 (API 42-435-38206) is a plugged well in Sutton County, plugged January 12, 2022, last operated by Henry Petroleum LLC.

The RRC has issued one drilling permit, issued November 10, 2006, permitted to 4,200 ft.

It was permitted by Mextex Operating Company and has since transferred to Henry Petroleum LLC on the wellbore schedule.

Completion filings report 2 formation tops, including Wolfcamp, Canyon.

Operator of record

Henry Petroleum LLC

Permitted by Mextex Operating Company; the EWA schedule now lists a different operator.

Flower Mound, TX · P-5 Y, filed Jun 4, 2026 · (972) 754-6281

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHenry Petroleum LLC
Production reportsMextex Operating Companythrough May 2008
Latest permitMextex Operating CompanyNov 10, 2006

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,200
total depth, ft
1
permits on file
Nov 10, 2006
last permit issued
Mar 13, 2007
completed
0
cumulative oil, bbl
1.22K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 2007 THROUGH Jan 2022

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 13, 2007
Shut in
—
Plugged
Jan 12, 2022

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Brockman, George G-9-232982Sawyer (Canyon)Henry Petroleum LLC101.22KMar 2007 – Jan 2022

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Mextex Operating CompanyMar 2007 → May 2008

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
628856-99DrillMextex Operating CompanyNov 10, 2006Nov 10, 2006Nov 14, 20064,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-9-232982————

Formation tops

As filed on W-2/G-1. Subsea from 2,260 ft elevation.Download CSV →

FormationMD ftSubsea
Wolfcamp1,820440
Canyon2,624-364

Perforations

Perforated and open-hole intervals.

FromToType
2,9943,012Perforated
3,0203,026Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,11011390 S
4.53,6877.875700 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 21, 2008May 10, 2007Yes
00Feb 12, 2008——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/43538206, documented in the API reference.