WELL · 42-435-39354 · DISTRICT 7

Epps 48 #2

Y

Sutton County · Sawyer (Canyon) field · Producing  · Vertical

Epps 48 #2 (API 42-435-39354) is a well in Sutton County operated by Lolocav LLC, completed June 23, 2011 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued May 26, 2011, permitted to 7,000 ft.

It was permitted by King Operating Corporation and has since transferred to Lolocav LLC on the wellbore schedule.

Completion filings report 6 formation tops, including A, B, C, Wolfcamp.

No lease production has been reported under this well’s leases.

Operator of record

Lolocav LLC

Permitted by King Operating Corporation; the EWA schedule now lists a different operator.

Sonora, TX · P-5 Y, filed Aug 4, 2025 · (325) 226-8476

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleLolocav LLC
Production reportsLolocav, LLCthrough Apr 2026
Latest permitKing Operating CorporationMay 26, 2011

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,000
total depth, ft
1
permits on file
May 26, 2011
last permit issued
Jun 23, 2011
completed
0
cumulative oil, bbl
476K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 2011 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 23, 2011
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Epps 48 G-9-271252Sawyer (Canyon)Lolocav, LLC10476KNov 2011 – Jul 2026

Gas, mcf lease total

Last 12 months 4,040 · prior 12 2,434(+66%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1King Operating CorporationNov 2011 → Oct 2019
  2. 2Lolocav, LLCAug 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
717196-99DrillKing Operating CorporationMay 25, 2011May 26, 2011Jun 14, 20117,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-9-271252————

Formation tops

As filed on W-2/G-1. Subsea from 2,175 ft elevation.Download CSV →

FormationMD ftSubsea
A12,174
B12,174
C12,174
Wolfcamp1,360815
Cisco4,823-2,648
Canyon5,164-2,989

Perforations

Perforated and open-hole intervals.

FromToType
6,3406,364Perforated
6,3766,388Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,325—450 S
8.6251,32512.25550 S
4.56,6087.875830 S
4.56,608—830 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 23, 2014Mar 12, 2014Yes
00Jan 31, 2014Jan 6, 2012Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/43539354, documented in the API reference.