TEXAS · WELLS · TARRANT COUNTY · JOHNSON, LOTTIE BARTON LEASE · API 42-439-30195 · DISTRICT 7C

Johnson Lottie Barton #6

Shut in

Tarrant County · Newark East (Barnett Shale) field · Producing  · Vertical

Johnson Lottie Barton #6 (API 42-439-30195) is a well in Tarrant County operated by Bkv Barnett LLC, completed May 21, 2001 and listed as producing on the RRC schedule, shut in January 1, 2024.

The RRC has issued one drilling permit, issued February 5, 2001, permitted to 7,507 ft.

It was permitted by Mitchell Energy Company L.P. and has since transferred to Bkv Barnett LLC on the wellbore schedule.

Completion filings report 4 formation tops, including Caddo, Marble Falls, Barnett, Viola.

No lease production has been reported under this well’s leases.

Operator of record

BKV Barnett LLC

Permitted by Mitchell Energy Company L.P.; the EWA schedule now lists a different operator.

Based in
Fort Worth, TX
P-5 status
Active (A)
P-5 last filed
Mar 11, 2026
Permits on file
143
Phone
(940) 394-2000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBKV Barnett LLC
Production reportsBKV Barnett, LLCthrough Sep 2025
Latest permitMitchell Energy Company L.P.Feb 5, 2001

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,507
total depth, ft
1
permits on file
Feb 5, 2001
last permit issued
May 21, 2001
completed
0
cumulative oil, bbl
1.75M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 2001 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 21, 2001
Shut in
Jan 1, 2024
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Johnson, Lottie Barton G-13-183186Newark, East (Barnett Shale)BKV Barnett, LLC101.75MMay 2001 – Jul 2026

Gas, mcf lease total

Last 12 months 529 · prior 12 426(+24%)

0200400202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Mitchell Energy Company L.P.Jun 2001 → Mar 2002
  2. 2Devon Energy Operating Co., L.P.Apr 2002 → Jul 2004
  3. 3Devon Energy Production Co, L.P.Aug 2004 → Sep 2020
  4. 4BKV Barnett, LLCOct 2020 → Sep 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
504932-99DrillMitchell Energy Company L.P.Feb 5, 2001Feb 5, 2001Mar 21, 20017,700

Completions

CompletedLeaseFieldOperatorStatusDepth
May 21, 2001Johnson Lottie Barton G-13-183186Newark East (Barnett Shale)BKV Barnett LLCProducing · shut in Jan 1, 20247,507

Formation tops

As filed on W-2/G-1. Subsea from 787 ft elevation.Download CSV →

FormationMD ftSubsea
Caddo3,128-2,341
Marble Falls6,740-5,953
BarnettBARNETT SHALE7,011-6,224
Viola7,452-6,665

Perforations

Perforated and open-hole intervals.

FromToType
7,0897,407Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,13412.25560 S
5.57,5037.875735 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 20, 2001Jun 29, 2001Yes
00Jul 17, 2001——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/43930195, documented in the API reference.