WELL · 42-439-30260 · DISTRICT 5
Indian Creek #G 1
Tarrant County · Newark East (Barnett Shale) field · Producing · Vertical
Indian Creek #G 1 (API 42-439-30260) is a well in Tarrant County operated by Bkv North Texas LLC, completed July 26, 2003 and listed as producing on the RRC schedule.
The RRC has issued 4 drilling permits between 2001 and 2003, permitted to 7,700 ft.
It was permitted by Walsh, F H JR. Operating CO. Inc and has since transferred to Bkv North Texas LLC on the wellbore schedule.
Completion filings report 4 formation tops, including Caddo, Atoka, Marble Falls, Barnett.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Walsh, F H Jr. Operating Co. Inc; the EWA schedule now lists a different operator.
- Based in
- Fort Worth, TX
- P-5 status
- Active (A)
- P-5 last filed
- Apr 30, 2026
- Permits on file
- 22
- Phone
- (940) 394-2000
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | BKV North Texas LLC |
| Production reports | BKV North Texas, LLCthrough Apr 2026 |
| Latest permit | Walsh, F H Jr. Operating Co. IncMar 26, 2003 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,700
- total depth, ft
- 4
- permits on file
- Mar 26, 2003
- last permit issued
- Jul 26, 2003
- completed
- 0
- cumulative oil, bbl
- 1.28M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Feb 2002 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jul 26, 2003
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Indian Creek G-5-192566 | Newark, East (Atoka 2B) | BKV North Texas, LLC | 1 | 0 | 3.73K | Nov 2002 – Jul 2026 |
| Indian Creek G-5-193230 | Newark, East (Atoka 1) | BKV North Texas, LLC | 1 | 0 | 69.5K | Dec 2002 – Jul 2026 |
| Indian Creek G-5-196355 | Newark, East (Caddo Lime) | BKV North Texas, LLC | 1 | 0 | 653K | Jun 2003 – Jul 2026 |
| Indian Creek G-13-188407 | Newark, East (Barnett Shale) | BKV North Texas, LLC | 1 | 0 | 553K | Feb 2002 – Jul 2026 |
Gas, mcf lease total
Last 12 months 14,405 · prior 12 15,576(-8%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Walsh, F H Jr. Operating Co. IncFeb 2002 → Mar 2007
- 2XTO Energy Inc.Apr 2007 → May 2022
- 3BKV North Texas, LLCJun 2022 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 529998-99 | Recompletion | Walsh, F H Jr. Operating Co. Inc | Mar 26, 2003 | Mar 26, 2003 | May 12, 2003 | 7,204 |
| 527395-99 | Recompletion | Walsh, F H Jr. Operating Co. Inc | Jan 16, 2003 | Jan 16, 2003 | Nov 25, 2002 | 3,400 |
| 524915-99 | Recompletion | Walsh, F H Jr. Operating Co. Inc | Oct 23, 2002 | Oct 23, 2002 | Oct 26, 2002 | 7,204 |
| 513616-99 | Drill | Walsh, F H Jr. Operating Co. Inc | Sep 14, 2001 | Sep 14, 2001 | Oct 19, 2001 | 7,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-5-192566 | — | — | — | — |
| — | — G-5-193230 | — | — | — | — |
| — | — G-5-196355 | — | — | — | — |
| — | — G-13-188407 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 750 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,080 | 3,304 | Perforated |
| 3,280 | 3,304 | Perforated |
| 3,340 | 3,374 | Perforated |
| 3,572 | 3,590 | Perforated |
| 3,598 | 3,610 | Perforated |
| 6,776 | 6,970 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 16 | 40 | 24 | 10 S |
| 9.625 | 1,115 | 12.25 | 200 S |
| 5.5 | 7,204 | 8.75 | 150 S |
| 5.5 | — | 8.75 | 400 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 11, 2026 | Jul 6, 2026 | — |
| 00 | Jul 31, 2026 | Jun 24, 2026 | — |
| 00 | Jul 28, 2026 | Jul 6, 2026 | — |
| 00 | Jul 7, 2026 | Jun 2, 2026 | — |
| 00 | Jun 26, 2026 | Jun 24, 2026 | — |
| 00 | Jun 22, 2004 | Feb 25, 2004 | — |
| 00 | Apr 23, 2004 | Feb 25, 2004 | Yes |
| 00 | Sep 17, 2003 | Jul 10, 2003 | Yes |
| 00 | Sep 17, 2003 | Jan 23, 2003 | Yes |
| 00 | Sep 9, 2003 | — | — |
| 00 | Mar 13, 2003 | — | — |
| 00 | Mar 5, 2003 | Dec 19, 2002 | Yes |
| 00 | Feb 5, 2003 | — | — |
| 00 | Jul 11, 2002 | Apr 16, 2002 | Yes |
| 00 | May 8, 2002 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-439-30260 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-439-30260 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/43930260, documented in the API reference.