WELL · 42-439-30299 · DISTRICT 5
Indian Creek #L 1
Tarrant County · Vertical
Indian Creek #L 1 (API 42-439-30299) is a permitted well in Tarrant County filed by Walsh, F H JR. Operating CO. Inc; no completion report is on file yet.
The RRC has issued 5 drilling permits between 2001 and 2003, permitted to 7,700 ft.
Completion filings report 4 formation tops, including Caddo, Atoka, Marble Falls, Barnett.
Operator of record
Walsh, F H Jr. Operating Co. Inc
- Based in
- Fort Worth, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Jun 3, 2020
- Permits on file
- 150
- Phone
- (817) 336-2062
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | BKV North Texas, LLCthrough Apr 2026 |
| Latest permit | Walsh, F H Jr. Operating Co. IncMar 27, 2003 |
- 7,700
- total depth, ft
- 5
- permits on file
- Mar 27, 2003
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 2.03M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jun 2002 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Indian Creek G-5-191579 | Newark, East (Atoka 5) | BKV North Texas, LLC | 1 | 0 | 1.77K | Sep 2002 – Jul 2026 |
| Indian Creek G-5-192570 | Newark, East (Atoka 2A) | BKV North Texas, LLC | 1 | 0 | 296 | Oct 2002 – Jul 2026 |
| Indian Creek G-5-192859 | Newark, East (Caddo Lime) | BKV North Texas, LLC | 1 | 0 | 1.62M | Oct 2002 – Jul 2026 |
| Indian Creek G-13-189900 | Newark, East (Barnett Shale) | BKV North Texas, LLC | 1 | 0 | 410K | Jun 2002 – Jul 2026 |
Gas, mcf lease total
Last 12 months 8,759 · prior 12 9,845(-11%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Walsh, F H Jr. Operating Co. IncJun 2002 → Mar 2007
- 2XTO Energy Inc.Apr 2007 → May 2022
- 3BKV North Texas, LLCJun 2022 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 530061-99 | Recompletion | Walsh, F H Jr. Operating Co. Inc | Mar 27, 2003 | Mar 27, 2003 | — | 7,188 |
| 527139-99 | Recompletion | Walsh, F H Jr. Operating Co. Inc | Jan 9, 2003 | Jan 9, 2003 | Oct 16, 2002 | 3,495 |
| 527023-99 | Recompletion | Walsh, F H Jr. Operating Co. Inc | Jan 7, 2003 | Jan 7, 2003 | Oct 2, 2002 | 3,740 |
| 521545-99 | Recompletion | Walsh, F H Jr. Operating Co. Inc | Jul 2, 2002 | Jul 2, 2002 | Aug 20, 2002 | 7,188 |
| 516494-99 | Drill | Walsh, F H Jr. Operating Co. Inc | Dec 28, 2001 | Dec 28, 2001 | Apr 19, 2002 | 7,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-5-191579 | — | — | — | — |
| — | — G-5-192570 | — | — | — | — |
| — | — G-5-192859 | — | — | — | — |
| — | — G-13-189900 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 745 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 394 | 3,436 | Perforated |
| 3,394 | 3,436 | Perforated |
| 3,624 | 3,658 | Perforated |
| 5,308 | 5,374 | Perforated |
| 6,765 | 7,041 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,120 | 12.25 | 225 S |
| 5.5 | 7,188 | 8.75 | 675 S |
| 5.5 | — | 8.75 | 225 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 31, 2026 | Jun 23, 2026 | — |
| 00 | Jul 30, 2026 | Jun 24, 2026 | — |
| 00 | Jul 22, 2026 | Jun 23, 2026 | — |
| 00 | Jun 25, 2026 | Jun 21, 2026 | — |
| 00 | Aug 5, 2004 | May 7, 2004 | — |
| 00 | Jul 28, 2004 | May 7, 2004 | — |
| 00 | Mar 13, 2003 | Jan 2, 2003 | Yes |
| 00 | Mar 13, 2003 | Oct 29, 2002 | Yes |
| 00 | Mar 7, 2003 | Dec 6, 2002 | Yes |
| 00 | Feb 14, 2003 | — | — |
| 00 | Feb 5, 2003 | — | — |
| 00 | Dec 4, 2002 | — | — |
| 00 | Oct 22, 2002 | Jun 25, 2002 | Yes |
| 00 | Aug 14, 2002 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-439-30299 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-439-30299 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/43930299, documented in the API reference.