TEXAS · WELLS · TARRANT COUNTY · INDIAN CREEK LEASE · API 42-439-30986 · DISTRICT 7C

Indian Creek #F 3

Shut in

Tarrant County · Newark East (Barnett Shale) field · Temp Abandoned  · Vertical

Indian Creek #F 3 (API 42-439-30986) is a well in Tarrant County operated by Bkv North Texas LLC, completed October 11, 2004 and listed as temp abandoned on the RRC schedule, shut in March 1, 2016.

The RRC has issued 2 drilling permits between 2004 and 2005, permitted to 7,315 ft.

It was permitted by Antero Resources I, LP and has since transferred to Bkv North Texas LLC on the wellbore schedule.

Completion filings report 7 formation tops, including Caddo, Top Nemesis, Top Nesesis, Marble Falls.

No lease production has been reported under this well’s leases.

Operator of record

BKV North Texas LLC

Permitted by Antero Resources I, LP; the EWA schedule now lists a different operator.

Based in
Fort Worth, TX
P-5 status
Active (A)
P-5 last filed
Apr 30, 2026
Permits on file
24
Phone
(940) 394-2000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBKV North Texas LLC
Production reportsXTO Energy Inc.through Feb 2016
Latest permitAntero Resources I, LPMar 23, 2005

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,315
total depth, ft
2
permits on file
Mar 23, 2005
last permit issued
Oct 11, 2004
completed
0
cumulative oil, bbl
460K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 2004 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 11, 2004
Shut in
Mar 1, 2016
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Indian Creek G-13-204880Newark, East (Barnett Shale)BKV North Texas, LLC10460KOct 2004 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Antero Resources I, LPNov 2004 → Jun 2005
  2. 2XTO Energy Inc.Jul 2005 → Feb 2016

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
559351-99RecompletionAntero Resources I, LPMar 22, 2005Mar 23, 2005—7,315
550643-99DrillAntero Resources I, LPSep 8, 2004Sep 8, 2004—7,450

Completions

CompletedLeaseFieldOperatorStatusDepth
Oct 11, 2004Indian Creek G-13-204880Newark East (Barnett Shale)BKV North Texas LLCTemp Abandoned · shut in Mar 1, 20167,315

Formation tops

As filed on W-2/G-1. Subsea from 866 ft elevation.Download CSV →

FormationMD ftSubsea
CaddoUPPER CADDO LIME3,093-2,227
Top Nemesis6,152-5,286
Top Nesesis6,152-5,286
Marble Falls6,595-5,729
BarnettUPPER BARNETT SHALE6,925-6,059
Forrestburg6,943-6,077
BarnettLOWER BARNETT SHALE7,003-6,137
Viola7,253-6,387

Perforations

Perforated and open-hole intervals.

FromToType
6,9327,179Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,06412.25515 S
77,3158.75785 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 12, 2026Apr 23, 2026—
00Mar 9, 2005Nov 29, 2004Yes
00Dec 29, 2004——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/43930986, documented in the API reference.