TEXAS · WELLS · TARRANT COUNTY · INDIAN CREEK LEASE · API 42-439-30991 · DISTRICT 7C

Indian Creek #D 3

Shut in

Tarrant County · Newark East (Barnett Shale) field · Temp Abandoned  · Vertical

Indian Creek #D 3 (API 42-439-30991) is a well in Tarrant County operated by Bkv North Texas LLC, completed October 10, 2004 and listed as temp abandoned on the RRC schedule, shut in September 1, 2021.

The RRC has issued 2 drilling permits between 2004 and 2005, permitted to 7,319 ft.

It was permitted by Antero Resources I, LP and has since transferred to Bkv North Texas LLC on the wellbore schedule.

Completion filings report 7 formation tops, including Caddo, Nemesis, Nemesls, Marble Falls.

No lease production has been reported under this well’s leases.

Operator of record

BKV North Texas LLC

Permitted by Antero Resources I, LP; the EWA schedule now lists a different operator.

Based in
Fort Worth, TX
P-5 status
Active (A)
P-5 last filed
Apr 30, 2026
Permits on file
24
Phone
(940) 394-2000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBKV North Texas LLC
Production reportsXTO Energy Inc.through Aug 2021
Latest permitAntero Resources I, LPJan 14, 2005

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,319
total depth, ft
2
permits on file
Jan 14, 2005
last permit issued
Oct 10, 2004
completed
0
cumulative oil, bbl
345K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 2004 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 10, 2004
Shut in
Sep 1, 2021
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Indian Creek G-13-204878Newark, East (Barnett Shale)BKV North Texas, LLC10345KOct 2004 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Antero Resources I, LPOct 2004 → Jun 2005
  2. 2XTO Energy Inc.Jul 2005 → Aug 2021

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
556017-99RecompletionAntero Resources I, LPJan 11, 2005Jan 14, 2005—7,250
550838-99DrillAntero Resources I, LPSep 10, 2004Sep 14, 2004—7,250

Completions

CompletedLeaseFieldOperatorStatusDepth
Oct 10, 2004Indian Creek G-13-204878Newark East (Barnett Shale)BKV North Texas LLCTemp Abandoned · shut in Sep 1, 20217,319

Formation tops

As filed on W-2/G-1. Subsea from 853 ft elevation.Download CSV →

FormationMD ftSubsea
CaddoUPPER CADDO LIME2,964-2,111
Nemesis6,153-5,300
Nemesls6,153-5,300
Marble Falls6,579-5,726
BarnettUPPER BARNETT SHALE6,906-6,053
Forrestburg6,974-6,121
BarnettLOWER BARNETT SHALE6,982-6,129
Viola7,235-6,382

Perforations

Perforated and open-hole intervals.

FromToType
6,9257,180Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,16212.25575 S
77,3198.75200 S
7—8.75175 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 3, 2026Apr 23, 2026—
00Mar 9, 2005Nov 17, 2004Yes
00Dec 29, 2004——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/43930991, documented in the API reference.