TEXAS · WELLS · TARRANT COUNTY · WALSH RANCH WEST LEASE · API 42-439-31024 · DISTRICT 7C

Walsh Ranch West #A 1

Shut in

Tarrant County · Newark East (Barnett Shale) field · Temp Abandoned  · Directional

Walsh Ranch West #A 1 (API 42-439-31024) is a well in Tarrant County operated by Walsh & Watts Inc., completed June 20, 2007 and listed as temp abandoned on the RRC schedule, shut in December 1, 2012.

The RRC has issued one drilling permit (amended 3 times), issued October 21, 2004, permitted to 6,880 ft.

It was permitted by Antero Resources I, LP and has since transferred to Walsh & Watts Inc. on the wellbore schedule.

Completion filings report 2 formation tops, including Marble Falls, Barnett.

Its lease has reported 87 barrels of oil and 46.7K mcf of gas since January 2005, with no volume in the three years through April 2026.

Operator of record

Walsh & Watts Inc.

Permitted by Antero Resources I, LP; the EWA schedule now lists a different operator.

Based in
Aledo, TX
P-5 status
Active (A)
P-5 last filed
Dec 2, 2025
Permits on file
361
Phone
(469) 428-3381

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWalsh & Watts Inc.
Production reportsWalsh & Watts, Inc.through Nov 2012
Latest permitAntero Resources I, LPOct 21, 2004

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,880
total depth, ft
4
permits on file
Oct 21, 2004
last permit issued
Jun 20, 2007
completed
87
cumulative oil, bbl
46.7K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 2007 THROUGH Nov 2012

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 20, 2007
Shut in
Dec 1, 2012
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Walsh Ranch West G-13-208809Newark, East (Barnett Shale)Walsh & Watts, Inc.18746.7KJan 2005 – Nov 2012

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1XTO Energy Inc.Jun 2007 → Nov 2012

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
552342-96DrillAntero Resources I, LPFeb 25, 2005Oct 21, 2004Dec 19, 20047,000
552342-97DrillAntero Resources I, LPDec 17, 2004Oct 21, 2004Dec 19, 20047,000
552342-98DrillAntero Resources I, LPDec 2, 2004Oct 21, 2004—7,000
552342-99DrillAntero Resources I, LPOct 15, 2004Oct 21, 2004—7,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 20, 2007Walsh Ranch West G-13-208809Newark East (Barnett Shale)Walsh & Watts Inc.Temp Abandoned · shut in Dec 1, 20126,880

Formation tops

As filed on W-2/G-1. Subsea from 907 ft elevation.Download CSV →

FormationMD ftSubsea
Marble Falls6,632-5,725
BarnettUPPER BARNETT6,665-5,758
Marble Falls6,892-5,985
Barnett6,925-6,018

Perforations

Perforated and open-hole intervals.

FromToType
6,9557,100Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,04412.25525 S
77,1448.75600 S
7—8.75275 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Aug 15, 2007Jul 19, 2007—
00Oct 17, 2005May 2, 2005—
00Jun 23, 2005——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/43931024, documented in the API reference.