TEXAS · WELLS · TARRANT COUNTY · CROWLEY MINERALS LEASE · API 42-439-31061 · DISTRICT 7C

Crowley Minerals #1

Shut in

Tarrant County · Newark East (Barnett Shale) field · Producing  · Horizontal

Crowley Minerals #1 (API 42-439-31061) is a horizontal well in Tarrant County operated by Tep Barnett USA LLC, completed May 28, 2005 and listed as producing on the RRC schedule, shut in July 1, 2018.

The RRC has issued one drilling permit, issued November 18, 2004, permitted to 7,252 ft.

It was permitted by Four Sevens Operating CO., Ltd. and has since transferred to Tep Barnett USA LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Marble Falls, Barnett, Viola.

No lease production has been reported under this well’s leases.

Operator of record

TEP Barnett USA LLC

Permitted by Four Sevens Operating Co., Ltd.; the EWA schedule now lists a different operator.

Based in
Fort Worth, TX
P-5 status
Active (A)
P-5 last filed
Apr 10, 2026
Permits on file
371
Phone
(817) 720-1100

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTEP Barnett USA LLC
Production reportsTEP Barnett USA, LLCthrough May 2023
Latest permitFour Sevens Operating Co., Ltd.Nov 18, 2004

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,252
total depth, ft
1
permits on file
Nov 18, 2004
last permit issued
May 28, 2005
completed
0
cumulative oil, bbl
2.14M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 2005 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 28, 2005
Shut in
Jul 1, 2018
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Crowley Minerals G-13-209701Newark, East (Barnett Shale)TEP Barnett USA, LLC102.14MMay 2005 – Jul 2026

Gas, mcf lease total

Last 12 months 0 · prior 12 0

0204060202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Four Sevens Operating Co., Ltd.May 2005 → Jun 2006
  2. 2Chesapeake Operating, Inc.Jul 2006 → Feb 2014
  3. 3Chesapeake Operating, L.L.C.Jan 2015 → Jul 2017
  4. 4TEP Barnett USA, LLCAug 2017 → May 2023

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
553808-99DrillFour Sevens Operating Co., Ltd.Nov 18, 2004Nov 18, 2004—9,000

Completions

CompletedLeaseFieldOperatorStatusDepth
May 28, 2005Crowley Minerals G-13-209701Newark East (Barnett Shale)TEP Barnett USA LLCProducing · shut in Jul 1, 20187,252

Formation tops

As filed on W-2/G-1. Subsea from 701 ft elevation.Download CSV →

FormationMD ftSubsea
Marble FallsTOP OF MARBLE FALLS6,818-6,117
BarnettTOP OF UPPER BARNETT7,072-6,371
ViolaTOP OF VIOLA7,335-6,634

Perforations

Perforated and open-hole intervals.

FromToType
7,59510,110Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,30712.25460 S
5.510,1727.875900 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 6, 2005Jul 19, 2005—
00Nov 22, 2005Jun 20, 2005Yes
00Jul 28, 2005——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/43931061, documented in the API reference.