TEXAS · WELLS · TARRANT COUNTY · CHAPEL CREEK LEASE · API 42-439-31250 · DISTRICT 7C
Chapel Creek #4H
Tarrant County · Newark East (Barnett Shale) field · Temp Abandoned · Horizontal
Chapel Creek #4H (API 42-439-31250) is a permitted horizontal well in Tarrant County filed by Chesapeake Operating, Inc.; no completion report is on file yet.
The RRC has issued one drilling permit (amended once), issued May 13, 2005, permitted to 6,867 ft.
It was permitted by Chesapeake Operating, Inc. and has since transferred to Tep Barnett USA LLC on the wellbore schedule.
Completion filings report 2 formation tops, including Atoka, Barnett.
Operator of record
Permitted by Chesapeake Operating, Inc.; the EWA schedule now lists a different operator.
- Based in
- Fort Worth, TX
- P-5 status
- Active (A)
- P-5 last filed
- Apr 10, 2026
- Permits on file
- 371
- Phone
- (817) 720-1100
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | TEP Barnett USA LLC |
| Production reports | none |
| Latest permit | Chesapeake Operating, Inc.May 13, 2005 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,867
- total depth, ft
- 2
- permits on file
- May 13, 2005
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · May 2006 THROUGH —
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- —
- Shut in
- Jun 1, 2008
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Chapel Creek G-13-251515 | Newark, East (Barnett Shale) | TEP Barnett USA, LLC | 1 | 0 | 0 | May 2006 – — |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 600623-98 | Drill | Chesapeake Operating, Inc. | Sep 23, 2009 | May 13, 2005 | Oct 9, 2005 | 9,000 |
| 600623-99 | Drill | Four Sevens Operating Co., Ltd. | May 13, 2005 | May 13, 2005 | Oct 9, 2005 | 9,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | Chapel Creek G-13-251515 | Newark East (Barnett Shale) | TEP Barnett USA LLC | Temp Abandoned · shut in Jun 1, 2008 | 6,867 |
Formation tops
As filed on W-2/G-1. Subsea from 833 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,408 | 7,792 | Perforated |
| 7,905 | 8,416 | Perforated |
| 8,565 | 9,018 | Perforated |
| 9,128 | 9,617 | Perforated |
| 9,800 | 10,005 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,050 | 12.25 | 385 S |
| 5.5 | 10,035 | 8.75 | 1,255 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 13, 2009 | Jun 24, 2008 | Yes |
| 00 | Oct 9, 2009 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-439-31250 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-439-31250 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/43931250, documented in the API reference.