TEXAS · WELLS · TARRANT COUNTY · KLUGE UNIT LEASE · API 42-439-33173 · DISTRICT 7C

Kluge Unit #2H

Shut in

Tarrant County · Newark East (Barnett Shale) field · Producing  · Horizontal

Kluge Unit #2H (API 42-439-33173) is a horizontal well in Tarrant County operated by Bkv North Texas LLC, completed June 17, 2008 and listed as producing on the RRC schedule, shut in September 1, 2020.

The RRC has issued one drilling permit (amended twice), issued March 6, 2008, permitted to 6,753 ft.

It was permitted by Xto Energy Inc. and has since transferred to Bkv North Texas LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Bend, Marble Falls, Barnett.

Its lease has reported 1.69M mcf of gas since June 2008, with no volume in the three years through April 2026.

Operator of record

BKV North Texas LLC

Permitted by XTO Energy Inc.; the EWA schedule now lists a different operator.

Based in
Fort Worth, TX
P-5 status
Active (A)
P-5 last filed
Apr 30, 2026
Permits on file
24
Phone
(940) 394-2000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBKV North Texas LLC
Production reportsBKV North Texas, LLCthrough Aug 2020
Latest permitXTO Energy Inc.Mar 6, 2008

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,753
total depth, ft
3
permits on file
Mar 6, 2008
last permit issued
Jun 17, 2008
completed
0
cumulative oil, bbl
1.69M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 2008 THROUGH Aug 2020

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 17, 2008
Shut in
Sep 1, 2020
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Kluge Unit G-13-240275Newark, East (Barnett Shale)BKV North Texas, LLC101.69MJun 2008 – Aug 2020

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1XTO Energy Inc.Jun 2008 → Aug 2020

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
656150-97DrillXTO Energy Inc.May 23, 2008Mar 6, 2008Mar 17, 200811,000
656150-98DrillXTO Energy Inc.Mar 13, 2008Mar 6, 2008—11,000
656150-99DrillXTO Energy Inc.Feb 26, 2008Mar 6, 2008Mar 17, 200811,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 17, 2008Kluge Unit G-13-240275Newark East (Barnett Shale)BKV North Texas LLCProducing · shut in Sep 1, 20206,753

Formation tops

As filed on W-2/G-1. Subsea from 717 ft elevation.Download CSV →

FormationMD ftSubsea
Bend5,936-5,219
Marble Falls6,264-5,547
BarnettUPPER BARNETT6,610-5,893

Perforations

Perforated and open-hole intervals.

FromToType
7,1078,915Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62582012.25270 S
5.58,9908.75775 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Oct 15, 2008Jul 22, 2008Yes
00Oct 11, 2008——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/43933173, documented in the API reference.