TEXAS · WELLS · TARRANT COUNTY · FEDERAL NORTH LEASE · API 42-439-33467 · DISTRICT 7C

Federal North #F 1H

Y

Tarrant County · Newark East (Barnett Shale) field · Producing  · Horizontal

Federal North #F 1H (API 42-439-33467) is a horizontal well in Tarrant County operated by Bkv North Texas LLC, completed January 21, 2008 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued June 21, 2008, permitted to 7,216 ft.

It was permitted by Xto Energy Inc. and has since transferred to Bkv North Texas LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Bend, Marble Falls, Barnett.

Its lease has reported 2.34M mcf of gas since January 2008, last reporting volume in April 2026.

Operator of record

BKV North Texas LLC

Permitted by XTO Energy Inc.; the EWA schedule now lists a different operator.

Based in
Fort Worth, TX
P-5 status
Active (A)
P-5 last filed
Apr 30, 2026
Permits on file
24
Phone
(940) 394-2000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBKV North Texas LLC
Production reportsBKV North Texas, LLCthrough Apr 2026
Latest permitXTO Energy Inc.Jun 21, 2008

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,216
total depth, ft
1
permits on file
Jun 21, 2008
last permit issued
Jan 21, 2008
completed
0
cumulative oil, bbl
2.34M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 2008 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jan 21, 2008
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Federal North G-13-240742Newark, East (Barnett Shale)BKV North Texas, LLC102.34MJan 2008 – Apr 2026

Gas, mcf lease total

Last 12 months 21,902 · prior 12 25,915(-15%)

05K10K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1XTO Energy Inc.Jan 2008 → May 2022
  2. 2BKV North Texas, LLCJun 2022 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
663636-99DrillXTO Energy Inc.Jun 3, 2008Jun 21, 2008Oct 28, 200711,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Jan 21, 2008Federal North G-13-240742Newark East (Barnett Shale)BKV North Texas LLCProducing7,216

Formation tops

As filed on W-2/G-1. Subsea from 764 ft elevation.Download CSV →

FormationMD ftSubsea
Bend5,744-4,980
Marble Falls6,467-5,703
BarnettUPPER BARNETT6,805-6,041

Perforations

Perforated and open-hole intervals.

FromToType
7,2419,607Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,09512.25375 S
5.59,6808.75915 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Oct 28, 2008Jun 11, 2008Yes
00Oct 21, 2008——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/43933467, documented in the API reference.