TEXAS · WELLS · TARRANT COUNTY · COLBY LEASE · API 42-439-34002 · DISTRICT 7C

Colby #5H

Y

Tarrant County · Newark East (Barnett Shale) field · Producing  · Horizontal

Colby #5H (API 42-439-34002) is a horizontal well in Tarrant County operated by Tep Barnett USA LLC, completed November 29, 2010 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued November 25, 2008, permitted to 8,380 ft.

It was permitted by Chesapeake Operating, Inc. and has since transferred to Tep Barnett USA LLC on the wellbore schedule.

Completion filings report 2 formation tops, including Atoka, Barnett.

Its lease has reported 2.42M mcf of gas since October 2009, last reporting volume in April 2026.

Operator of record

TEP Barnett USA LLC

Permitted by Chesapeake Operating, Inc.; the EWA schedule now lists a different operator.

Based in
Fort Worth, TX
P-5 status
Active (A)
P-5 last filed
Apr 10, 2026
Permits on file
371
Phone
(817) 720-1100

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTEP Barnett USA LLC
Production reportsTEP Barnett USA, LLCthrough Apr 2026
Latest permitChesapeake Operating, Inc.Nov 25, 2008

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,380
total depth, ft
2
permits on file
Nov 25, 2008
last permit issued
Nov 29, 2010
completed
0
cumulative oil, bbl
2.42M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 2010 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 29, 2010
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Colby G-13-254662Newark, East (Barnett Shale)TEP Barnett USA, LLC102.42MOct 2009 – Apr 2026

Gas, mcf lease total

Last 12 months 84,429 · prior 12 137,672(-39%)

010K20K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Chesapeake Operating, Inc.Nov 2010 → Oct 2014
  2. 2Chesapeake Operating, L.L.C.Nov 2014 → Jul 2017
  3. 3TEP Barnett USA, LLCAug 2017 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
675215-98DrillChesapeake Operating, Inc.Jul 1, 2009Nov 25, 2008Oct 12, 20099,000
675215-99DrillChesapeake Operating, Inc.Nov 19, 2008Nov 25, 2008—9,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Nov 29, 2010Colby G-13-254662Newark East (Barnett Shale)TEP Barnett USA LLCProducing8,380

Formation tops

As filed on W-2/G-1. Subsea from 566 ft elevation.Download CSV →

FormationMD ftSubsea
AtokaBASAL ATOKA8,113-7,547
BarnettUPPER BARNETT8,213-7,647
BarnettLOWER BARNETT8,317-7,751

Perforations

Perforated and open-hole intervals.

FromToType
8,92511,601Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62544212.25515 S
9.6251,96012.25515 S
9.6251,960——
5.511,6988.751,420 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00May 28, 2024Mar 18, 2024—
00Apr 5, 2011Feb 17, 2011—
00Apr 13, 2010Feb 16, 2010Yes
00Feb 22, 2010——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/43934002, documented in the API reference.