TEXAS · WELLS · TARRANT COUNTY · BRASSIE LEASE · API 42-439-34834 · DISTRICT 7C

Brassie #1H

Shut in

Tarrant County · Newark East (Barnett Shale) field · Temp Abandoned  · Horizontal

Brassie #1H (API 42-439-34834) is a horizontal well in Tarrant County operated by Tep Barnett USA LLC, completed January 24, 2013 and listed as temp abandoned on the RRC schedule, shut in October 1, 2013.

The RRC has issued one drilling permit (amended 4 times), issued February 17, 2010, permitted to 7,483 ft.

It was permitted by Chesapeake Operating, Inc. and has since transferred to Tep Barnett USA LLC on the wellbore schedule.

Completion filings report 2 formation tops, including Atoka, Barnett.

Its lease has reported 84.5K mcf of gas since January 2012, with no volume in the three years through August 2026.

Operator of record

TEP Barnett USA LLC

Permitted by Chesapeake Operating, Inc.; the EWA schedule now lists a different operator.

Based in
Fort Worth, TX
P-5 status
Active (A)
P-5 last filed
Apr 10, 2026
Permits on file
371
Phone
(817) 720-1100

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTEP Barnett USA LLC
Production reportsTEP Barnett USA, LLCthrough Sep 2013
Latest permitChesapeake Operating, Inc.Feb 17, 2010

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,483
total depth, ft
5
permits on file
Feb 17, 2010
last permit issued
Jan 24, 2013
completed
0
cumulative oil, bbl
84.5K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · JAN 2013 THROUGH SEP 2013

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jan 24, 2013
Shut in
Oct 1, 2013
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Wells nearby

Every well with a location on file around this well, in any state, nearest first.

Loading the map…

Open the full map →

Texas locations come from drilling permits, so most older Texas wells have none and are not listed.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH AUG 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Brassie G-13-264373Newark, East (Barnett Shale)TEP Barnett USA, LLC1084.5KJan 2012 – Sep 2013

No volumes reported on these leases in the last three years.

Wells named Brassie

TEP Barnett USA LLC's other wells filed under this lease name in Tarrant County, newest permit first. The RRC gives a gas well its own lease number, so the name is what joins the wells of a unit.

Loading the lease's wells

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Chesapeake Operating, Inc.Jan 2013 → Sep 2013

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
691275-95DrillChesapeake Operating, Inc.Aug 4, 2011Feb 17, 2010Jan 9, 20129,000
691275-96DrillChesapeake Operating, Inc.Jun 28, 2010Feb 17, 2010—9,000
691275-97DrillChesapeake Operating, Inc.Jun 18, 2010Feb 17, 2010—9,000
691275-98DrillChesapeake Operating, Inc.Apr 30, 2010Feb 17, 2010—9,000
691275-99DrillChesapeake Operating, Inc.Feb 12, 2010Feb 17, 2010—9,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Jan 24, 2013Brassie G-13-264373Newark East (Barnett Shale)TEP Barnett USA LLCTemp Abandoned · shut in Oct 1, 20137,483

Formation tops

As filed on W-2/G-1. Subsea from 593 ft elevation.Download CSV →

FormationMD ftSubsea
AtokaATOKA LIME6,540-5,947
BarnettUPPER BARNETT7,230-6,637
BarnettLOWER BARNETT7,317-6,724

Perforations

Perforated and open-hole intervals.

FromToType
7,8408,451Perforated
8,5509,160Perforated
9,2599,870Perforated
10,67911,290Perforated
11,38911,999Perforated
12,09812,709Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,41712.25400 S
5.512,8048.75360 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Aug 23, 2013Mar 6, 2013—
00Aug 7, 2012Mar 13, 2012Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/43934834, documented in the API reference.