TEXAS · WELLS · TARRANT COUNTY · TINDALL LEASE · API 42-439-34843 · DISTRICT 7C

Tindall #3H

Shut in

Tarrant County · Newark East (Barnett Shale) field · Producing  · Horizontal

Tindall #3H (API 42-439-34843) is a horizontal well in Tarrant County operated by Tep Barnett USA LLC, completed November 26, 2011 and listed as producing on the RRC schedule, shut in May 1, 2023.

The RRC has issued one drilling permit (amended once), issued February 17, 2010, permitted to 7,122 ft.

It was permitted by Chesapeake Operating, Inc. and has since transferred to Tep Barnett USA LLC on the wellbore schedule.

Completion filings report 2 formation tops, including Atoka, Barnett.

No lease production has been reported under this well’s leases.

Operator of record

TEP Barnett USA LLC

Permitted by Chesapeake Operating, Inc.; the EWA schedule now lists a different operator.

Based in
Fort Worth, TX
P-5 status
Active (A)
P-5 last filed
Apr 10, 2026
Permits on file
371
Phone
(817) 720-1100

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTEP Barnett USA LLC
Production reportsTEP Barnett USA, LLCthrough Apr 2023
Latest permitChesapeake Operating, Inc.Feb 17, 2010

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,122
total depth, ft
2
permits on file
Feb 17, 2010
last permit issued
Nov 26, 2011
completed
0
cumulative oil, bbl
973K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 2010 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 26, 2011
Shut in
May 1, 2023
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Tindall G-13-257805Newark, East (Barnett Shale)TEP Barnett USA, LLC10973KJul 2010 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Chesapeake Operating, Inc.Nov 2011 → Oct 2014
  2. 2Chesapeake Operating, L.L.C.Nov 2014 → Jul 2017
  3. 3TEP Barnett USA, LLCAug 2017 → Apr 2023

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
691276-98DrillChesapeake Operating, Inc.Feb 19, 2010Feb 17, 2010Jun 28, 20109,000
691276-99DrillChesapeake Operating, Inc.Feb 12, 2010Feb 17, 2010—9,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Nov 26, 2011Tindall G-13-257805Newark East (Barnett Shale)TEP Barnett USA LLCProducing · shut in May 1, 20237,122

Formation tops

As filed on W-2/G-1. Subsea from 521 ft elevation.Download CSV →

FormationMD ftSubsea
AtokaATOKA LIME6,222-5,701
BarnettUPPER BARNETT6,948-6,427
BarnettLOWER BARNETT7,014-6,493
BarnettLOWER BARNETT8,025-7,504

Perforations

Perforated and open-hole intervals.

FromToType
7,4209,996Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,30212.25370 S
5.510,0978.751,360 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 17, 2012Jan 12, 2012—
00Oct 26, 2010Aug 25, 2010Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/43934843, documented in the API reference.