TEXAS · WELLS · TARRANT COUNTY · LONESTAR UNIT LEASE · API 42-439-34919 · DISTRICT 7C

Lonestar Unit #5H

Y

Tarrant County · Newark East (Barnett Shale) field · Producing  · Horizontal

Lonestar Unit #5H (API 42-439-34919) is a horizontal well in Tarrant County operated by Upp Operating LLC, completed July 11, 2011 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended twice), issued March 10, 2010, permitted to 8,563 ft.

It was permitted by Carrizo Oil & Gas, Inc. and has since transferred to Upp Operating LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Base Cretaceous (marker), Bend, Barnett.

No lease production has been reported under this well’s leases.

Operator of record

Upp Operating LLC

Permitted by Carrizo Oil & Gas, Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Mar 6, 2026
Permits on file
33
Phone
(713) 495-5300

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleUpp Operating LLC
Production reportsUpp Operating, LLCthrough Apr 2026
Latest permitCarrizo Oil & Gas, Inc.Mar 10, 2010

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,563
total depth, ft
3
permits on file
Mar 10, 2010
last permit issued
Jul 11, 2011
completed
0
cumulative oil, bbl
932K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 2011 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jul 11, 2011
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Lonestar Unit G-13-261895Newark, East (Barnett Shale)Upp Operating, LLC10932KJan 2011 – Jul 2026

Gas, mcf lease total

Last 12 months 2,898 · prior 12 21,555(-87%)

05K10K15K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Carrizo Oil & Gas, Inc.Sep 2011 → Oct 2013
  2. 2Enervest Operating, L.L.C.Nov 2013 → Nov 2016
  3. 3Saddle Operating, LLCDec 2016 → Mar 2019
  4. 4Upp Operating, LLCApr 2019 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
692485-97DrillCarrizo Oil & Gas, Inc.Apr 5, 2011Mar 10, 2010Jan 4, 20119,000
692485-98DrillCarrizo Oil & Gas, Inc.Dec 16, 2010Mar 10, 2010Jan 4, 20119,000
692485-99DrillCarrizo Oil & Gas, Inc.Mar 8, 2010Mar 10, 2010—9,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Jul 11, 2011Lonestar Unit G-13-261895Newark East (Barnett Shale)Upp Operating LLCProducing8,563

Formation tops

As filed on W-2/G-1. Subsea from 601 ft elevation.Download CSV →

FormationMD ftSubsea
Base Cretaceous (marker)BASE CRETACEOUS1,950-1,349
Base Cretaceous (marker)BASE OF CRETACEOUS1,950-1,349
BendMIDDLE BEND MARKER8,141-7,540
BarnettBARNETT SHALE8,495-7,894
BarnettTOP BARNETT SHALE8,495-7,894

Perforations

Perforated and open-hole intervals.

FromToType
8,95812,972Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,04212.25670 S
5.513,0948.751,928 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 4, 2012Oct 14, 2011Yes
00Jan 24, 2012Jul 22, 2011Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/43934919, documented in the API reference.