TEXAS · WELLS · TARRANT COUNTY · NEWELL LEASE · API 42-439-35750 · DISTRICT 7C

Newell #5H

Plugged

Tarrant County · Newark East (Barnett Shale) field  · Horizontal

Newell #5H (API 42-439-35750) is a plugged horizontal well in Tarrant County, plugged June 17, 2026, last operated by Tep Barnett USA LLC.

The RRC has issued one drilling permit, issued February 24, 2011, permitted to 9,000 ft.

It was permitted by Chesapeake Operating, Inc. and has since transferred to Tep Barnett USA LLC on the wellbore schedule.

Completion filings report 2 formation tops, including Marble Falls, Barnett.

Its lease has reported 1.02M mcf of gas since May 2011, with no volume in the three years through April 2026.

Operator of record

TEP Barnett USA LLC

Permitted by Chesapeake Operating, Inc.; the EWA schedule now lists a different operator.

Based in
Fort Worth, TX
P-5 status
Active (A)
P-5 last filed
Apr 10, 2026
Permits on file
371
Phone
(817) 720-1100

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTEP Barnett USA LLC
Production reportsTEP Barnett USA, LLCthrough Mar 2022
Latest permitChesapeake Operating, Inc.Feb 24, 2011

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,000
total depth, ft
1
permits on file
Feb 24, 2011
last permit issued
Oct 28, 2011
completed
0
cumulative oil, bbl
1.02M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 2011 THROUGH Mar 2022

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 28, 2011
Shut in
—
Plugged
Jun 17, 2026

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Newell G-13-261032Newark, East (Barnett Shale)TEP Barnett USA, LLC101.02MMay 2011 – Mar 2022

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Chesapeake Operating, Inc.Oct 2011 → Oct 2014
  2. 2Chesapeake Operating, L.L.C.Nov 2014 → Jun 2016
  3. 3TEP Barnett USA, LLCOct 2017 → Mar 2022

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
710765-99DrillChesapeake Operating, Inc.Feb 22, 2011Feb 24, 2011Apr 27, 20119,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Oct 28, 2011Newell G-13-261032Newark East (Barnett Shale)TEP Barnett USA LLCPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 531 ft elevation.Download CSV →

FormationMD ftSubsea
Marble Falls7,211-6,680
BarnettUPPER BARNETT7,346-6,815
BarnettLOWER BARNETT7,418-6,887

Perforations

Perforated and open-hole intervals.

FromToType
7,77810,554Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,49312.25440 S
5.510,6558.751,045 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00May 11, 2012Jan 3, 2012—
00Oct 13, 2011Jun 6, 2011Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/43935750, documented in the API reference.