WELL · 42-441-04361 · DISTRICT 7

Guitar, Earl B. #2-13

N

Taylor County  · Vertical

Guitar, Earl B. #2-13 (API 42-441-04361) is a well in Taylor County operated by Bettis, Boyle & Stovall, completed July 5, 1941.

The RRC has issued one drilling permit, issued September 26, 1978, permitted to 2,400 ft.

No lease production has been reported under this well’s leases.

Operator of record

Bettis, Boyle & Stovall

Based in
Graham, TX
P-5 status
Inactive (I)
P-5 last filed
Feb 25, 2022
Permits on file
530
Phone
(940) 549-0780

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitBettis, Boyle & StovallSep 26, 1978
2,400
total depth, ft
1
permits on file
Sep 26, 1978
last permit issued
Jul 5, 1941
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 5, 1941
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
33457-99OtherBettis, Boyle & StovallSep 26, 1978Sep 26, 1978Nov 8, 19782,400

Completions

CompletedLeaseFieldOperatorStatusDepth
Jul 5, 1941— O-8-4450——Not on Schedule—

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1984Aug 11, 1941—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/44104361, documented in the API reference.