WELL · 42-441-31551 · DISTRICT 7

Davis Edgar B #3

Plugged

Taylor County · Trey (Flippen) field  · Vertical

Davis Edgar B #3 (API 42-441-31551) is a plugged well in Taylor County, plugged January 31, 2000, last operated by D. A. B. Oil Service Inc..

The RRC has issued 2 drilling permits between 1980 and 1981, permitted to 4,999 ft.

Completion filings report 5 formation tops, including Coleman Junction, Saddle Creek, Palo Pinto, Capps Lime.

Operator of record

D. A. B. Oil Service Inc.

Based in
Abilene, TX
P-5 status
Inactive (I)
P-5 last filed
Feb 27, 2012
Permits on file
114
Phone
(325) 698-9335

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleD. A. B. Oil Service Inc.
Production reportsnone
Latest permitD. A. B. Oil Service, Inc.Sep 18, 1981
4,999
total depth, ft
2
permits on file
Sep 18, 1981
last permit issued
Nov 1, 1983
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2000

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 1, 1983
Shut in
—
Plugged
Jan 31, 2000

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Davis Edgar "B" O-8-15495Trey (Flippen)D. A. B. Oil Service, Inc.200Jan 1993 – Apr 2000

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
133616-99RecompletionD. A. B. Oil Service, Inc.Sep 18, 1981Sep 18, 1981Jul 18, 19814,999
73994-99DrillD. A. B. Oil Service, Inc.Mar 3, 1980Mar 3, 1980Mar 18, 19804,999

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-15495————

Formation tops

As filed on W-2/G-1. Subsea from 2,435 ft elevation.Download CSV →

FormationMD ftSubsea
Coleman JunctionBASE COLEMAN JUNCTION2,571-136
Saddle Creek3,163-728
Palo Pinto4,106-1,671
Capps Lime4,830-2,395
Base Capps4,860-2,425

Perforations

Perforated and open-hole intervals.

FromToType
3,2003,210Perforated
4,8334,836Perforated
4,8464,856Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62536011200 S
2.8753,210——
4.54,9387.875730 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 28, 1984Feb 21, 1984—
00Jan 12, 1984Feb 21, 1984—
00Jan 12, 1984Nov 2, 1980—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

4.96K
bbl, last 12 reported months
400K
bbl, all reported
Dec 1999
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000049023H-1 InjectionPlugged Feb 18, 2000003,200–0

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 4,958 · prior 12 17,057(-71%)

01K2K3K19981999

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/44131551, documented in the API reference.