WELL · 42-441-33823 · DISTRICT 7

King #2

Shut in

Taylor County · Weaver Springs (Palo Pinto) field · Shut IN  · Directional

King #2 (API 42-441-33823) is a permitted well in Taylor County filed by Hallwood Petroleum, Inc.; no completion report is on file yet.

The RRC has issued one drilling permit (amended twice), issued April 9, 1997, permitted to 6,250 ft.

It was permitted by Hallwood Petroleum, Inc. and has since transferred to Sojourner Drilling Corporation on the wellbore schedule.

Completion filings report 5 formation tops, including Dothan, Noodle Creek, Flippen, Palo Pinto.

Its lease has reported 33.9K barrels of oil and 3.76K mcf of gas since March 1998, last reporting in July 2026.

Operator of record

Sojourner Drilling Corporation

Permitted by Hallwood Petroleum, Inc.; the EWA schedule now lists a different operator.

Based in
Abilene, TX
P-5 status
Active (A)
P-5 last filed
Oct 7, 2025
Permits on file
872
Phone
(325) 672-2832

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSojourner Drilling Corporation
Production reportsSojourner Drilling Corporationthrough Jan 2017
Latest permitHallwood Petroleum, Inc.Apr 9, 1997

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,250
total depth, ft
3
permits on file
Apr 9, 1997
last permit issued
—
completed
33.9K
cumulative oil, bbl
3.76K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 1998 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
—
Shut in
Dec 1, 2017
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
King O-8-28446Weaver Springs (Palo Pinto)Sojourner Drilling Corporation133.9K3.76KMar 1998 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Hallwood Petroleum, Inc.Mar 1998 → Dec 1999
  2. 2L.C.S. Production CompanyJan 2000 → Sep 2003
  3. 3Crownquest Operating, LLCOct 2003 → Sep 2004
  4. 4Whiting Oil and Gas CorporationOct 2004 → Apr 2010
  5. 5Sojourner Drilling CorporationJul 2010 → Jan 2017

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
460881-97DrillHallwood Petroleum, Inc.Apr 3, 1998Apr 9, 1997Dec 31, 19976,250
460881-98DrillHallwood Petroleum, Inc.Nov 12, 1997Apr 9, 1997—6,250
460881-99DrillHallwood Petroleum, Inc.Apr 9, 1997Apr 9, 1997—6,150

Completions

CompletedLeaseFieldOperatorStatusDepth
—King O-8-28446Weaver Springs (Palo Pinto)Sojourner Drilling CorporationShut IN · shut in Dec 1, 20176,250

Formation tops

As filed on W-2/G-1. Subsea from 2,152 ft elevation.Download CSV →

FormationMD ftSubsea
Dothan2,700-548
Noodle Creek2,803-651
Flippen3,107-955
Palo Pinto4,521-2,369
Ellenburger5,772-3,620

Perforations

Perforated and open-hole intervals.

FromToType
4,5214,543Perforated
4,5544,560Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62538712.25275 S
5.55,8027.875420 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 31, 1998Apr 13, 1998Yes
00Apr 30, 1998——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/44133823, documented in the API reference.