WELL · 42-441-34221 · DISTRICT 7

Wagstaff-A & S Railway Unit #3

Plugged

Taylor County · Tuscola N. (Flippen Sand) field  · Vertical

Wagstaff-A & S Railway Unit #3 (API 42-441-34221) is a plugged well in Taylor County, plugged January 14, 2025, last operated by L.C.S. Production Company.

The RRC has issued 2 drilling permits between 2007 and 2020, permitted to 4,999 ft.

Completion filings report 5 formation tops, including Flippen Sand, Gardner Lime, Gardner Limestone, Caddo.

Its 2 leases have reported 60.1K barrels of oil and 29.5K mcf of gas since June 1998, last reporting in July 2026. The leases carry 7 wells, so these are lease totals, not this well alone.

Operator of record

L.C.S. Production Company

Abilene, TX · P-5 Y, filed May 4, 2026 · 1,707 permits on file · (325) 691-1085

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleL.C.S. Production Company
Production reportsL.C.S. Production Companythrough Dec 2024
Latest permitL.C.S. Production CompanyNov 10, 2020
4,999
total depth, ft
2
permits on file
Nov 10, 2020
last permit issued
Nov 16, 2020
completed
60.1K
cumulative oil, bbl
29.5K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 1998 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 16, 2020
Shut in
—
Plugged
Jan 14, 2025

Surface location

32.239472, -99.791616

OpenStreetMap → ·  Google Maps →

Permit surface location from the RRC GIS record, in Taylor County.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 7 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Wagstaff-A & S Railway Unit O-8-32474Tuscola, N. (Flippen Sand)L.C.S. Production Company31.93K0Nov 2020 – Jul 2026
Wagstaff-A & S Railway Unit O-8-28488Taylor County RegularL.C.S. Production Company458.2K29.5KJun 1998 – Jan 2025

Oil, barrels lease total

Last 12 months 0 · prior 12 4(-100%)

0102030202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Adkins, R. L. Corp.Jun 1998 → Jun 2013
  2. 2TDC Engineering, Inc.Jul 2013 → Dec 2015
  3. 3RMB Operating LLCJan 2016 → May 2019
  4. 4L.C.S. Production CompanyJun 2019 → Dec 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
865957-99RecompletionL.C.S. Production CompanyNov 5, 2020Nov 10, 2020Nov 10, 20204,000
650858-99DrillAdkins, R. L. Corp.Dec 6, 2007Dec 20, 2007Dec 30, 20074,999

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-28488————
—— O-8-32474————

Formation tops

As filed on W-2/G-1. Subsea from 1,943 ft elevation.Download CSV →

FormationMD ftSubsea
Flippen Sand2,132-189
Gardner Lime4,174-2,231
Gardner Limestone4,174-2,231
Caddo4,538-2,595
Ellenburger4,849-2,906

Perforations

Perforated and open-hole intervals.

FromToType
2,1322,138Perforated
4,1804,198Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62519412.25140 S
4.54,9337.875350 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 21, 2021Dec 7, 2020—
00Oct 1, 2008Aug 19, 2008Yes
00Aug 28, 2008——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Nearby wells and their tops

NEAREST 8 LOCATED WELLS WITH TOPS · WITHIN 16 KM

Draw a cross-section

This well's tops beside its 5 nearest neighbours, subsea-aligned so they line up regardless of surface terrain.

Open the cross-section →

Dunbar42-441-34205

0.3 KM · L.C.S. Production Company · Section with this well →

Flippen Sand2,150-211
Gardner Lime4,180-2,241
Gray Sand4,444-2,505
Caddo4,543-2,604
Ellenburger4,918-2,979
Ellenburger4,918-2,979

Wagstaff-A &S Railway Unit42-441-34262

0.3 KM · L.C.S. Production Company · Section with this well →

Flippen Sand2,124-190
Gardner Lime4,154-2,220
Gardner Limestone4,154-2,220
Caddo4,567-2,633
Ellenburger4,855-2,921

Christian, Bessie Lou42-441-34667

0.5 KM · RHB Exploration & Production,llc · Section with this well →

Unidentified-County Regular - DI—
Cisco—
Coleman Junction—
Cook - Disposal—
Flippen - Disposal—
Hope Lime - Disposal—
King Sand - Disposal—
Palo Pinto—

10 TOPS · FIRST 8

Wagstaff-A & S Railway Unit42-441-33875

0.6 KM · L.C.S. Production Company · Section with this well →

Flippen Sand2,129-179
Cook Sand2,209-259
Goen Lime/Sand3,993-2,043
Gardner Lime4,172-2,222

Dunbar42-441-33957

0.6 KM · L.C.S. Production Company · Section with this well →

Flippen Sand2,120-180
Gardner Lime4,162-2,222
Gardner Sand4,212-2,272

Dunbar42-441-34008

0.7 KM · L.C.S. Production Company · Section with this well →

Flippen Sand2,134-189
Cross Plains Sand3,582-1,637
Gardner Lime4,168-2,223

Dunbar42-441-34061

1.0 KM · L.C.S. Production Company · Section with this well →

Flippen Sand2,156-199
Cross Plains Sand3,618-1,661
Gardner Lime4,204-2,247

Southall42-441-33867

1.0 KM · L.C.S. Production Company · Section with this well →

Flippen Sand2,136-179
Cook Sand2,235-278
Cook Sand/Lime4,005-2,048
Gardner Lime4,173-2,216

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/44134221, documented in the API reference.