WELL · 42-441-34262 · DISTRICT 7

Wagstaff-A & S Railway Unit #4

Plugged

Taylor County · Tuscola N. (Flippen Sand) field  · Vertical

Wagstaff-A & S Railway Unit #4 (API 42-441-34262) is a plugged well in Taylor County, plugged January 7, 2025, last operated by L.C.S. Production Company.

The RRC has issued 2 drilling permits between 2009 and 2020, permitted to 4,999 ft.

Completion filings report 5 formation tops, including Flippen Sand, Gardner Lime, Gardner Limestone, Caddo.

Its 2 leases have reported 60.1K barrels of oil and 29.5K mcf of gas since June 1998, last reporting in July 2026. The leases carry 7 wells, so these are lease totals, not this well alone.

Operator of record

L.C.S. Production Company

Abilene, TX · P-5 Y, filed May 4, 2026 · 1,707 permits on file · (325) 691-1085

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleL.C.S. Production Company
Production reportsL.C.S. Production Companythrough Dec 2024
Latest permitL.C.S. Production CompanyNov 16, 2020
4,999
total depth, ft
2
permits on file
Nov 16, 2020
last permit issued
Nov 18, 2020
completed
60.1K
cumulative oil, bbl
29.5K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 1998 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 18, 2020
Shut in
—
Plugged
Jan 7, 2025

Surface location

32.239893, -99.788580

OpenStreetMap → ·  Google Maps →

Permit surface location from the RRC GIS record, in Taylor County.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 7 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Wagstaff-A & S Railway Unit O-8-32474Tuscola, N. (Flippen Sand)L.C.S. Production Company31.93K0Nov 2020 – Jul 2026
Wagstaff-A & S Railway Unit O-8-28488Taylor County RegularL.C.S. Production Company458.2K29.5KJun 1998 – Jan 2025

Oil, barrels lease total

Last 12 months 0 · prior 12 4(-100%)

0102030202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Adkins, R. L. Corp.Jun 1998 → Jun 2013
  2. 2TDC Engineering, Inc.Jul 2013 → Dec 2015
  3. 3RMB Operating LLCJan 2016 → May 2019
  4. 4L.C.S. Production CompanyJun 2019 → Dec 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
866049-99RecompletionL.C.S. Production CompanyNov 11, 2020Nov 16, 2020—4,000
678384-99DrillAdkins, R. L. Corp.Feb 9, 2009Feb 11, 2009Mar 20, 20094,999

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-28488————
—— O-8-32474————

Formation tops

As filed on W-2/G-1. Subsea from 1,934 ft elevation.Download CSV →

FormationMD ftSubsea
Flippen Sand2,124-190
Gardner Lime4,154-2,220
Gardner Limestone4,154-2,220
Caddo4,567-2,633
Ellenburger4,855-2,921

Perforations

Perforated and open-hole intervals.

FromToType
2,1242,130Perforated
4,1624,178Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62516412.25110 S
4.54,8797.875320 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 27, 2021Jan 21, 2021—
00Jan 20, 2021Dec 7, 2020—
00Oct 5, 2009Jul 8, 2009—
00Aug 14, 2009Jun 2, 2009Yes
00Jun 29, 2009——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Nearby wells and their tops

NEAREST 8 LOCATED WELLS WITH TOPS · WITHIN 16 KM

Draw a cross-section

This well's tops beside its 5 nearest neighbours, subsea-aligned so they line up regardless of surface terrain.

Open the cross-section →

Wagstaff-A. & S. Railway Unit42-441-34221

0.3 KM · L.C.S. Production Company · Section with this well →

Flippen Sand2,132-189
Gardner Limestone4,174-2,231
Gardner Lime4,174-2,231
Caddo4,538-2,595
Ellenburger4,849-2,906

Christian, Bessie Lou42-441-34667

0.4 KM · RHB Exploration & Production,llc · Section with this well →

Hope Lime - Disposal—
Flippen - Disposal—
Cook - Disposal—
Coleman Junction—
Cisco—
Unidentified-County Regular - DI—
Swastika - Disposal—
Saddle Creek—

10 TOPS · FIRST 8

Dunbar42-441-34205

0.6 KM · L.C.S. Production Company · Section with this well →

Flippen Sand2,150-211
Gardner Lime4,180-2,241
Gray Sand4,444-2,505
Caddo4,543-2,604
Ellenburger4,918-2,979
Ellenburger4,918-2,979

Wagstaff-A & S Railway Unit42-441-33875

0.6 KM · L.C.S. Production Company · Section with this well →

Flippen Sand2,129-179
Cook Sand2,209-259
Goen Lime/Sand3,993-2,043
Gardner Lime4,172-2,222

Dunbar42-441-33957

0.8 KM · L.C.S. Production Company · Section with this well →

Flippen Sand2,120-180
Gardner Lime4,162-2,222
Gardner Sand4,212-2,272

Dunbar42-441-34008

1.0 KM · L.C.S. Production Company · Section with this well →

Flippen Sand2,134-189
Cross Plains Sand3,582-1,637
Gardner Lime4,168-2,223

Southall42-441-33867

1.2 KM · L.C.S. Production Company · Section with this well →

Flippen Sand2,136-179
Cook Sand2,235-278
Cook Sand/Lime4,005-2,048
Gardner Lime4,173-2,216

Dunbar42-441-34061

1.3 KM · L.C.S. Production Company · Section with this well →

Flippen Sand2,156-199
Cross Plains Sand3,618-1,661
Gardner Lime4,204-2,247

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/44134262, documented in the API reference.