TEXAS · WELLS · TAYLOR COUNTY · API 42-441-34319 · DISTRICT 6E

Fowler #1

Plugged

Taylor County · Taylor County Regular field  · Vertical

Fowler #1 (API 42-441-34319) is a plugged well in Taylor County, plugged February 5, 2015, last operated by L.C.S. Production Company.

The RRC has issued 2 drilling permits between 2010 and 2013, permitted to 5,800 ft.

Completion filings report 2 formation tops, including Detrital, Blair, North (Ellenburger).

Its 2 leases have reported 1.08K barrels of oil since April 2011, last reporting in June 2015. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

L.C.S. Production Company

Based in
Abilene, TX
P-5 status
Active – Extension (X)
P-5 last filed
Jul 14, 2026
Permits on file
1,707
Phone
(325) 692-3903

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleL.C.S. Production Company
Production reportsClear Fork, Incorporatedthrough Sep 2012
Latest permitL.C.S. Production CompanyAug 19, 2013

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,800
total depth, ft
2
permits on file
Aug 19, 2013
last permit issued
Apr 12, 2013
completed
1.08K
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 2011 THROUGH Jun 2015

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 12, 2013
Shut in
—
Plugged
Feb 5, 2015

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Fowler O-8-31712Taylor County RegularL.C.S. Production Company100Apr 2013 – Jun 2015
Fowler O-8-30716Blair, North (Ellenburger)L.C.S. Production Company11.08K0Apr 2011 – Mar 2015

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Clear Fork, IncorporatedApr 2011 → Sep 2012

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
768243-99RecompletionL.C.S. Production CompanyAug 14, 2013Aug 19, 2013Mar 1, 20115,800
704928-99DrillClear Fork, IncorporatedNov 8, 2010Nov 10, 2010Mar 4, 20115,800

Completions

CompletedLeaseFieldOperatorStatusDepth
Apr 12, 2013Fowler O-8-31712Taylor County RegularL.C.S. Production CompanyPlugged—
Apr 18, 2011Fowler O-8-30716Blair North (Ellenburger)L.C.S. Production CompanyPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 1,939 ft elevation.Download CSV →

FormationMD ftSubsea
Detrital5,331-3,392
Blair, North (Ellenburger)5,800-3,861

Perforations

Perforated and open-hole intervals.

FromToType
5,3315,347Perforated
5,3615,463Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62517312.25100 S
4.55,4607.875335 S
4.5—7.875235 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 12, 2015Aug 20, 2013—
00Jun 15, 2011Apr 25, 2011Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Dec 2014
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000108581W-14 DisposalPlugged Feb 11, 20153,0001,8503,700–4,700

MONTHLY INJECTED, BBL · H-10 · LAST 12 REPORTED MONTHS

Last 12 months 0

012014

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/44134319, documented in the API reference.