WELL · 42-441-34574 · DISTRICT 7

O-V-W Flippen Sand Unit #8

Y

Taylor County · Taylor County Regular field · Producing  · Vertical

O-V-W Flippen Sand Unit #8 (API 42-441-34574) is a well in Taylor County operated by Bullet Development LLC, completed May 30, 2018 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued October 13, 2017, permitted to 1,999 ft.

Completion filings report 12 formation tops, including Coleman Junction, Flippen - Disposal, Canyon, Cisco.

Its lease has reported 1.41K barrels of oil since May 2018, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

Bullet Development LLC

Abilene, TX · P-5 Y, filed Mar 4, 2026 · 57 permits on file · (325) 829-0357

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBullet Development LLC
Production reportsBullet Development, LLCthrough Apr 2026
Latest permitBullet Development, LLCOct 13, 2017
1,999
total depth, ft
1
permits on file
Oct 13, 2017
last permit issued
May 30, 2018
completed
1.41K
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 2018 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 30, 2018
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

32.372636, -99.690899

OpenStreetMap → ·  Google Maps →

Permit surface location from the RRC GIS record, in Taylor County.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
O-V-W Flippen Sand Unit O-8-32318Taylor County RegularBullet Development, LLC21.41K0May 2018 – Jul 2026

Oil, barrels lease total

Last 12 months 155 · prior 12 276(-44%)

02040202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Bullet Development, LLCMar 2021 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
831456-99DrillBullet Development, LLCSep 28, 2017Oct 13, 2017May 25, 20181,999

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-32318————

Formation tops

As filed on W-2/G-1. Subsea from 1,796 ft elevation.Download CSV →

FormationMD ftSubsea
Coleman JunctionCOLEMAN JUNCTION - CORROSIVE, SW1,080716
Flippen - Disposal1,850-54
CanyonCANYON REEF - DISPOSAL——
CiscoCISCO - DISPOSAL——
Cook - Disposal——
Hope Lime - Disposal——
Hope Sand - Disposal——
King Sand - Disposal——
Palo PintoPALO PINTO LIME - DISPOSAL——
Saddle CreekSADDLE CREEK - DISPOSAL——
Swastika - Disposal——
Unidentified-County Regular - DI——

Perforations

Perforated and open-hole intervals.

FromToType
1,8501,864Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62512312.2580 S
4.51,9507.875400 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 18, 2021Mar 17, 2021—
00Feb 14, 2019Feb 12, 2019Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Nearby wells and their tops

NEAREST 8 LOCATED WELLS WITH TOPS · WITHIN 16 KM

Draw a cross-section

This well's tops beside its 5 nearest neighbours, subsea-aligned so they line up regardless of surface terrain.

Open the cross-section →

O-V-W Flippen Sand Unit42-441-34575

1.1 KM · Bullet Development, LLC · Section with this well →

Coleman Junction1,025747
Flippen - Disposal1,800-28
Cook - Disposal—
Cisco—
Unidentified-County Regular - DI—
Hope Lime - Disposal—
King Sand - Disposal—
Saddle Creek—

10 TOPS · FIRST 8

Lytle42-441-34570

2.2 KM · Bullet Development, LLC · Section with this well →

Coleman Junction1,000739
Flippen - Disposal1,778-39
Hope Lime - Disposal1,918-179
Palo Pinto3,420-1,681
King Sand - Disposal—
Unidentified-County Regular - DI—
Cook - Disposal—
Cisco—

10 TOPS · FIRST 8

Lytle42-441-34640

2.3 KM · Bullet Development, LLC · Section with this well →

Coleman Junction1,010728
Saddle Creek1,72018
Flippen - Disposal1,780-42
Hope Lime - Disposal1,895-157
Palo Pinto3,260-1,522
Cook - Disposal—
King Sand - Disposal—
Unidentified-County Regular - DI—

10 TOPS · FIRST 8

Lytle N-6842-441-34569

3.2 KM · Bullet Development, LLC · Section with this well →

Coleman Junction1,042681
Flippen - Disposal1,800-77
Hope Lime - Disposal—
King Sand - Disposal—
Palo Pinto—
Saddle Creek—
Swastika - Disposal—
Unidentified-County Regular - DI—

11 TOPS · FIRST 8

Skipper42-441-33861

3.7 KM · Winco Oil Inc. · Section with this well →

Saddle Creek1,73584
Flippen-Disposal1,76851
Hope Lime-Disposal1,863-44
Ellenburger4,704-2,885

Skipper42-441-34578

4.2 KM · Winco Oil Inc. · Section with this well →

Coleman Junction1,350479
Saddle Creek1,705124
Flippen - Disposal1,74287
Hope Lime - Disposal1,852-23
Cisco—
Cook - Disposal—
Unidentified-County Regular - DI—
Swastika - Disposal—

10 TOPS · FIRST 8

Sundance Kid42-441-34540

4.8 KM · Ogden Resources Corporation · Section with this well →

Coleman Junction1,002835
Coleman Junction1,002835
Saddle Creek1,622215
Saddle Creek1,622215
Flippen - Disposal1,75285
Flippen1,75285
Cook - Disposal1,840-3
Palo Pinto3,156-1,319

14 TOPS · FIRST 8

Butch Cassidy42-441-34576

5.3 KM · Ogden Resources Corporation · Section with this well →

Coleman Junction950862
Flippen - Disposal1,75854
Palo Pinto3,204-1,392
Ellenburger4,654-2,842
Hope Lime - Disposal—
Canyon—
Cambrian Sand - Disposal—
Hope Sand - Disposal—

14 TOPS · FIRST 8

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/44134574, documented in the API reference.