WELL · 42-443-30584 · DISTRICT 7
Mitchell 6 #5
Terrell County · Pakenham (Wolfcamp) field · Vertical
Mitchell 6 #5 (API 42-443-30584) is a plugged well in Terrell County, plugged October 11, 2012, last operated by Oxy USA Inc..
The RRC has issued one drilling permit, issued June 22, 1995, permitted to 9,000 ft.
It was permitted by Chevron U. S. A. Inc. and has since transferred to Oxy USA Inc. on the wellbore schedule.
Completion filings report 2 formation tops, including Cretaceous, Wolfcamp.
Operator of record
Permitted by Chevron U. S. A. Inc.; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active (A)
- P-5 last filed
- Jan 26, 2026
- Permits on file
- 3,316
- Phone
- (713) 215-7000
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | OXY USA Inc. |
| Production reports | OXY USA Inc.through May 2009 |
| Latest permit | Chevron U. S. A. Inc.Jun 22, 1995 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,000
- total depth, ft
- 1
- permits on file
- Jun 22, 1995
- last permit issued
- Sep 20, 1995
- completed
- 0
- cumulative oil, bbl
- 1.74M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Sep 1995 THROUGH Oct 2012
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 20, 1995
- Shut in
- —
- Plugged
- Oct 11, 2012
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Mitchell 6 G-9-156399 | Pakenham (Wolfcamp) | OXY USA Inc. | 1 | 0 | 1.74M | Sep 1995 – Oct 2012 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Chevron U. S. A. Inc.Sep 1995 → Aug 1999
- 2Athanor Texas Inc.Sep 1999 → Dec 2002
- 3Nuevo Texas Inc.Jan 2003 → Dec 2004
- 4PXP Texas Inc.Jan 2005 → Apr 2006
- 5Vintage Petroleum, LLCMar 2007 → Aug 2007
- 6OXY USA Inc.Apr 2009 → May 2009
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 437119-99 | Drill | Chevron U. S. A. Inc. | Jun 21, 1995 | Jun 22, 1995 | Jun 26, 1995 | 9,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Sep 20, 1995 | Mitchell 6 G-9-156399 | Pakenham (Wolfcamp) | OXY USA Inc. | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,618 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,680 | 8,225 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,120 | 12.25 | 975 S |
| 5.5 | 8,350 | 8.75 | 925 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 8, 1996 | Oct 23, 1995 | Yes |
| 00 | Dec 29, 1995 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-443-30584 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-443-30584 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/44330584, documented in the API reference.