WELL · 42-443-31154 · DISTRICT 7

Acu 48 #7

N

Terrell County · Acu (Strawn) field  · Vertical

Acu 48 #7 (API 42-443-31154) is a well in Terrell County operated by Encana Oil & Gas(USA) Inc., completed August 4, 2006.

The RRC has issued 2 drilling permits between 2006 and 2007, permitted to 12,100 ft.

Completion filings report 5 formation tops, including Woldcamp, Wolfcamp, Unconformithy, Unconformity.

No lease production has been reported under this well’s leases.

Operator of record

Encana Oil & Gas(usa) Inc.

Based in
Denver, CO
P-5 status
Inactive (I)
P-5 last filed
Dec 19, 2019
Permits on file
3,078
Phone
(303) 623-2300

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEncana Oil & Gas(usa) Inc.
Production reportsWhite Rock Oil & Gas, LLCthrough Apr 2026
Latest permitEncana Oil & Gas(usa) Inc.Aug 15, 2007

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,100
total depth, ft
2
permits on file
Aug 15, 2007
last permit issued
Aug 4, 2006
completed
0
cumulative oil, bbl
41.6K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 2006 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 4, 2006
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Acu "48" G-9-229376Pakenham (Wolfcamp)White Rock Oil & Gas, LLC1041.6KAug 2006 – Jul 2026
Acu "48" G-9-221035Acu (Strawn)Encana Oil & Gas(usa) Inc.100Aug 2006 – Aug 2006

Gas, mcf lease total

Last 12 months 529 · prior 12 1,408(-62%)

0200400600202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Encana Oil & Gas(usa) Inc.Nov 2006 → Jun 2009
  2. 2Marlin Energy Southwest GP, LLCJul 2009 → Jun 2014
  3. 3Legacy Reserves Operating LPJul 2014 → Sep 2018
  4. 4White Rock Oil & Gas, LLCOct 2018 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
644234-99RecompletionEncana Oil & Gas(usa) Inc.Aug 10, 2007Aug 15, 2007Apr 6, 200611,200
616212-99DrillEncana Oil & Gas(usa) Inc.Mar 21, 2006Mar 28, 2006Apr 7, 200612,100

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-9-221035————
—— G-9-229376————

Formation tops

As filed on W-2/G-1. Subsea from 2,839 ft elevation.Download CSV →

FormationMD ftSubsea
Woldcamp2,071768
Wolfcamp2,071768
WolfcampWOLFCAMP SAND 19,233-6,394
Unconformithy9,875-7,036
Unconformity9,875-7,036
PennsylvanianPENN SAND10,897-8,058

Perforations

Perforated and open-hole intervals.

FromToType
9,2879,831Perforated
9,7439,757Perforated
9,7709,776Perforated
9,7849,790Perforated
9,8359,839Perforated
10,76610,770Perforated
10,77610,782Perforated
10,78610,793Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3751,98317.51,635 S
9.6255,66412.3751,300 S
9.6255,66412.751,300 S
5.511,2008.51,300 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 26, 2007Aug 20, 2007Yes
00Sep 11, 2007——
00Mar 12, 2007Sep 21, 2006Yes
00Nov 8, 2006——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/44331154, documented in the API reference.