WELL · 42-445-30896 · DISTRICT 8

Crown #1

Plugged

Terry County · Crown (Silurian) field  · Vertical

Crown #1 (API 42-445-30896) is a plugged well in Terry County, plugged March 22, 1982, last operated by Union Texas Petroleum Corp..

The RRC has issued 2 drilling permits between 1980 and 2008, permitted to 13,900 ft.

It was permitted by Fasken Oil And Ranch, Ltd. and has since transferred to Union Texas Petroleum Corp. on the wellbore schedule.

Completion filings report 6 formation tops, including Rustler, San Andres, Strawn, Mississippian.

It holds an active disposal or injection permit, with 89.8K barrels injected in the 12 months reported through November 2025.

Operator of record

Union Texas Petroleum Corp.

Permitted by Fasken Oil and Ranch, Ltd.; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Sep 9, 1993 · 452 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleUnion Texas Petroleum Corp.
Production reportsnone
Latest permitFasken Oil and Ranch, Ltd.Jun 25, 2008

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,900
total depth, ft
2
permits on file
Jun 25, 2008
last permit issued
May 23, 1981
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 2008 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 23, 1981
Shut in
—
Plugged
Mar 22, 1982

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Crown O-11-69330Crown (Silurian)Fasken Oil and Ranch, Ltd.100Oct 2008 – Jul 2026

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
663999-99ReenterFasken Oil and Ranch, Ltd.Jun 9, 2008Jun 25, 2008Aug 26, 200813,900
103421-99DrillUnion Texas Petroleum Corp.Dec 30, 1980Dec 30, 1980Jan 28, 198113,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-69330————

Formation tops

As filed on W-2/G-1. Subsea from 3,428 ft elevation.Download CSV →

FormationMD ftSubsea
Rustler2,480948
San Andres5,048-1,620
Strawn11,612-8,184
MississippianUPPER MISS.12,572-9,144
Woodford13,162-9,734
Silurian (undifferentiated)SILURIAN13,202-9,774

Perforations

Perforated and open-hole intervals.

FromToType
13,20213,230Perforated
13,30813,350Perforated
13,41613,574Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37544517.5425 S
8.6255,100112,200 S
5.513,5807.8751,925 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 26, 2009Oct 30, 2008Yes
00Mar 3, 2009——
00Jan 12, 1984Jun 3, 1981—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

89.8K
bbl, last 12 reported months
1.52M
bbl, all reported
Nov 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000099286H-1 InjectionActive3,0001,0006,400–13,574

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 89,785 · prior 12 93,337(-4%)

05K10K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/44530896, documented in the API reference.