TEXAS · WELLS · TERRY COUNTY · PRENTICE (6700 CLEARFORK) UNIT LEASE · API 42-445-31050 · DISTRICT 7B

Prentice (6700 Clearfork) Unit #207

Plugged

Terry County · Prentice (6700) field  · Vertical

Prentice (6700 Clearfork) Unit #207 (API 42-445-31050) is a plugged well in Terry County, plugged May 7, 2024, last operated by Occidental Permian Ltd..

The RRC has issued one drilling permit, issued February 10, 1982, permitted to 7,100 ft.

It was permitted by Tenneco Oil CO. and has since transferred to Occidental Permian Ltd. on the wellbore schedule.

Completion filings report 5 formation tops, including Anhydrite, Yates, San Andres, Queen.

Its lease has reported 13.3M barrels of oil and 2.74M mcf of gas since January 1993, last reporting in July 2026. The lease carries 183 wells, so these are lease totals, not this well alone.

Operator of record

Occidental Permian Ltd.

Permitted by Tenneco Oil Co.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Feb 2, 2026
Permits on file
6,251
Phone
(713) 215-7000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleOccidental Permian Ltd.
Production reportsOccidental Permian Ltd.through Apr 2026
Latest permitTenneco Oil Co.Feb 10, 1982

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,100
total depth, ft
1
permits on file
Feb 10, 1982
last permit issued
May 25, 2012
completed
13.3M
cumulative oil, bbl
2.74M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 25, 2012
Shut in
—
Plugged
May 7, 2024

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 183 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Prentice (6700 Clearfork) Unit O-11-60864Prentice (6700)Occidental Permian Ltd.18313.3M2.74MJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 111,905 · prior 12 111,116(+1%)

05K10K15K202420252026

Gas, mcf lease total

Last 12 months 26,662 · prior 12 29,879(-11%)

01K2K3K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Amoco Production CompanyJan 1993 → Feb 1997
  2. 2Altura Energy Ltd.Mar 1997 → Apr 2000
  3. 3Occidental Permian Ltd.May 2000 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
150432-99DrillTenneco Oil Co.Feb 10, 1982Feb 10, 1982Mar 27, 19827,100

Completions

CompletedLeaseFieldOperatorStatusDepth
May 25, 2012Prentice (6700 Clearfork) Unit O-11-60864Prentice (6700)Occidental Permian Ltd.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 3,531 ft elevation.Download CSV →

FormationMD ftSubsea
Anhydrite2,5071,024
Yates3,151380
San Andres4,507-976
San AndresSAN ANDRES POROSITY5,153-1,622
Queen5,836-2,305
QueenQUEEN 58365,836-2,305
Clear ForkCLEARFORK, UPPER6,028-2,497
Clear ForkUPPER CLEARFORK6,028-2,497

Perforations

Perforated and open-hole intervals.

FromToType
6,3256,970Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6252,49912.251,350 S
2.8756,949——
5.57,0007.8751,010 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 20, 2018Jul 13, 2018—
00Aug 17, 2018Jul 13, 2018—
00Jul 16, 1999Apr 26, 1999—
00Jan 12, 1984Jun 1, 1982—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/44531050, documented in the API reference.