TEXAS · WELLS · THROCKMORTON COUNTY · API 42-447-01332 · DISTRICT 7C

Donnell W. T. -A- #4

Plugged

Throckmorton County · Murray (Mississippi) field  · Vertical

Donnell W. T. -A- #4 (API 42-447-01332) is a plugged well in Throckmorton County, plugged April 28, 1989, last operated by Chevron U. S. A. Inc..

The RRC has issued one drilling permit, issued February 7, 1989, permitted to 4,511 ft.

Operator of record

Chevron U. S. A. Inc.

Based in
Midland, TX
P-5 status
Active (A)
P-5 last filed
Jan 30, 2026
Permits on file
9,293
Phone
(866) 212-1212

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitChevron U. S. A. Inc.Feb 7, 1989
4,511
total depth, ft
1
permits on file
Feb 7, 1989
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Apr 28, 1989

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
355549-99RecompletionChevron U. S. A. Inc.Jan 26, 1989Feb 7, 1989—4,511

Completions

CompletedLeaseFieldOperatorStatusDepth
—Donnell W. T. -A- O-13-8093Murray (Mississippi)Chevron U. S. A. Inc.Plugged—

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/44701332, documented in the API reference.