TEXAS · WELLS · THROCKMORTON COUNTY · API 42-447-20135 · DISTRICT 6E
Parrott-Lunsford Unit #1
Throckmorton County · Parrott-Atkinson (Mississippian) field · Vertical
Parrott-Lunsford Unit #1 (API 42-447-20135) is a plugged well in Throckmorton County, plugged August 11, 2021, last operated by Stovall Operating CO..
The RRC has issued one drilling permit, issued March 4, 2014, permitted to 4,999 ft.
Completion filings report 2 formation tops, including Caddo, Mississippian.
Its 2 leases have reported 76K barrels of oil and 4.43K mcf of gas since January 1993, last reporting in October 2021. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
- Based in
- Graham, TX
- P-5 status
- Active (A)
- P-5 last filed
- Nov 25, 2025
- Permits on file
- 259
- Phone
- (940) 549-2616
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Stovall Operating Co. |
| Production reports | Stovall Operating Co.through May 2020 |
| Latest permit | Stovall Operating Co.Mar 4, 2014 |
- 4,999
- total depth, ft
- 1
- permits on file
- Mar 4, 2014
- last permit issued
- Oct 26, 1967
- completed
- 76K
- cumulative oil, bbl
- 4.43K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Oct 2021
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 26, 1967
- Shut in
- —
- Plugged
- Aug 11, 2021
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Parrott-Lunsford Unit O-8-31620 | Parrott-Atkinson (Mississippian) | Stovall Operating Co. | 1 | 18.6K | 0 | Oct 2012 – Oct 2021 |
| Parrott-Lunsford Unit O-8-10654 | Throckmorton County Regular | Stovall Operating Co. | 1 | 57.4K | 4.43K | Jan 1993 – Dec 2014 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Stovall Operating Co.Jan 1993 → May 2020
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 770363-99 | Field transfer | Stovall Operating Co. | Sep 19, 2013 | Mar 4, 2014 | Sep 26, 1967 | 4,999 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Oct 26, 1967 | Parrott-Lunsford Unit O-8-31620 | Parrott-Atkinson (Mississippian) | Stovall Operating Co. | Plugged | — |
| Oct 22, 1967 | Parrott-Lunsford Unit O-8-10654 | Throckmorton County Regular | Stovall Operating Co. | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,419 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Caddo | 4,101 | -2,682 |
| MississippianMISSISSIPPI | 4,636 | -3,217 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,642 | 4,647 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 104 | 12 | 75 S |
| 4.5 | 4,652 | 7.875 | 75 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 17, 2014 | May 5, 2014 | — |
| 00 | Jan 12, 1984 | Oct 25, 1967 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-447-20135 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-447-20135 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/44720135, documented in the API reference.