WELL · 42-447-31625 · DISTRICT 7
Dunlap #2 D
Throckmorton County · Vertical
Dunlap #2 D (API 42-447-31625) is a former disposal or injection well in Throckmorton County, last operated by Roach Oil CO.; its UIC permit is no longer active.
The RRC has issued 2 drilling permits between 1978 and 1979, permitted to 4,950 ft.
Operator of record
- Based in
- Amarillo, TX
- P-5 status
- Inactive (I)
- Permits on file
- 31
- Phone
- (806) 376-4371
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | none |
| Latest permit | Roach Oil Co.Jan 3, 1979 |
- 4,950
- total depth, ft
- 2
- permits on file
- Jan 3, 1979
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| — O-8-15506 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 40112-99 | Recompletion | Roach Oil Co. | Jan 3, 1979 | Jan 3, 1979 | Jan 9, 1979 | 4,833 |
| 20721-99 | Drill | Roach Oil Co. | Mar 24, 1978 | Mar 24, 1978 | Jun 14, 1978 | 4,950 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-15506 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,582 | 4,584 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 108 | 12.25 | 100 S |
| 2.375 | 4,250 | — | — |
| 2.375 | 4,575 | — | — |
| 4.5 | 4,833 | 7.875 | 150 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Oct 3, 1979 | — |
| 00 | Jan 12, 1984 | Oct 16, 1978 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-447-31625 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-447-31625 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 17.6K
- bbl, last 12 reported months
- 97.2K
- bbl, all reported
- Apr 1991
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000007774 | H-1 Injection | Plugged Sep 12, 1991 | 350 | 1,500 | 4,582–4,584 |
MONTHLY INJECTED, BBL · H-10 · LAST 12 REPORTED MONTHS
Last 12 months 17,595
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/44731625, documented in the API reference.