TEXAS · WELLS · THROCKMORTON COUNTY · API 42-447-32872 · DISTRICT 6E
McKnight H.M. #1
Throckmorton County · Roc (Tannehill) field · Vertical
Mcknight H.M. #1 (API 42-447-32872) is a plugged well in Throckmorton County, plugged June 18, 1984, last operated by Romac Oil Company Inc..
The RRC has issued one drilling permit, issued August 14, 1981, permitted to 1,000 ft.
Operator of record
- Based in
- Throckmorton, TX
- P-5 status
- Active (A)
- P-5 last filed
- Aug 27, 2025
- Permits on file
- 115
- Phone
- (940) 849-2261
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Romac Oil Company Inc. |
| Production reports | none |
| Latest permit | Romac Oil Company, Inc.Aug 14, 1981 |
- 1,000
- total depth, ft
- 1
- permits on file
- Aug 14, 1981
- last permit issued
- Aug 16, 1981
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 16, 1981
- Shut in
- —
- Plugged
- Jun 18, 1984
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 130306-99 | Drill | Romac Oil Company, Inc. | Aug 14, 1981 | Aug 14, 1981 | — | 1,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Aug 16, 1981 | McKnight H.M. G-8-97600 | Roc (Tannehill) | Romac Oil Company Inc. | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 637 | 639 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 4.5 | 655 | 6.25 | 110 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Sep 29, 1981 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-447-32872 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-447-32872 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 0
- bbl, all reported
- —
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000049263 | H-1 Injection | Plugged Jul 5, 1984 | 0 | 300 | 0–0 |
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/44732872, documented in the API reference.