WELL · 42-447-34736 · DISTRICT 7

Southland-Young #1

Plugged

Throckmorton County  · Vertical

Southland-Young #1 (API 42-447-34736) is a plugged well in Throckmorton County, plugged July 5, 1987, last operated by Ashtola Exploration Company,Inc..

The RRC has issued 2 drilling permits (amended once) between 1987 and 1990, permitted to 4,999 ft.

Completion filings report 4 formation tops, including Caddo, Conglomerate, Marble Falls, Mississippian.

Its 2 leases have reported 796K barrels of oil and 479 mcf of gas since January 1993, last reporting in July 2026. The leases carry 17 wells, so these are lease totals, not this well alone.

Operator of record

Ashtola Exploration Company,inc.

Based in
Amarillo, TX
P-5 status
Delinquent (D)
P-5 last filed
Feb 2, 2016
Permits on file
362
Phone
(806) 376-4371

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsEstacado Energy, LLCthrough Jun 2024
Latest permitAshtola Exploration Company,inc.Feb 23, 1990
4,999
total depth, ft
3
permits on file
Feb 23, 1990
last permit issued
—
completed
796K
cumulative oil, bbl
479
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Jul 5, 1987

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 17 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Greathouse Unit O-8-26902Greathouse (Conglomerate)Estacado Energy, LLC16796K479Feb 1993 – Jul 2026
Greathouse Unit G-8-138441Greathouse (Conglomerate)Ashtola Exploration Company,inc.100Jan 1993 – Jan 1998

Oil, barrels lease total

Last 12 months 0 · prior 12 187(-100%)

050100150202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Ashtola Exploration Company,inc.Feb 1993 → Dec 2012
  2. 2Cooper Oil & Gas, LLCJan 2013 → Jul 2023
  3. 3Estacado Energy, LLCOct 2023 → Jun 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
370174-98ReenterAshtola Exploration Company,inc.May 10, 1990Feb 23, 1990Apr 23, 19904,999
370174-99ReenterAshtola Exploration Company,inc.Feb 23, 1990Feb 23, 1990—4,999
331454-99DrillAshtola Exploration Company,inc.Jun 10, 1987Jun 10, 1987—4,999

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-8-138441————
—— O-8-26902————

Formation tops

As filed on W-2/G-1. Subsea from 1,250 ft elevation.Download CSV →

FormationMD ftSubsea
Caddo4,187-2,937
Conglomerate4,704-3,454
Marble Falls4,715-3,465
MississippianMISSISSIPPI4,800-3,550

Perforations

Perforated and open-hole intervals.

FromToType
4,6704,690Perforated
4,7064,714Perforated
4,7064,716Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62517512.25130 S
4.54,8147.875175 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 2, 2007Jan 31, 2007—
00Mar 9, 1998Jan 23, 1998—
00Feb 24, 1998——
00Jul 17, 1991May 8, 1991—
00Jun 27, 1991——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
504K
bbl, all reported
Aug 2007
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000087483H-1 InjectionPlugged May 21, 20075,0001,5004,706–4,716

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120062007

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/44734736, documented in the API reference.