WELL · 42-447-35104 · DISTRICT 7
Kelly Ranch C #2
Throckmorton County · Throckmorton County Regular field · Vertical
Kelly Ranch C #2 (API 42-447-35104) is a plugged well in Throckmorton County, plugged March 11, 1993, last operated by Burk Royalty Company.
The RRC has issued 2 drilling permits between 1990 and 1991, permitted to 4,800 ft.
Completion filings report 9 formation tops, including T/Palo Pinto, T/Dog Bend Ls, T/Upper Capps, T/Lower Strawn Sd.
Operator of record
- Based in
- Wichita Falls, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Feb 12, 2001
- Permits on file
- 552
- Phone
- (940) 397-8600
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Burk Royalty Company |
| Production reports | none |
| Latest permit | Burk Royalty CompanyApr 24, 1991 |
- 4,800
- total depth, ft
- 2
- permits on file
- Apr 24, 1991
- last permit issued
- Mar 28, 1991
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Oct 1994
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 28, 1991
- Shut in
- —
- Plugged
- Mar 11, 1993
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Kelly Ranch "C" O-8-26174 | Throckmorton County Regular | Burk Royalty Company | 1 | 0 | 0 | Jan 1993 – Oct 1994 |
| — O-8-25912 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 387027-99 | Recompletion | Burk Royalty Company | Apr 22, 1991 | Apr 24, 1991 | Feb 28, 1991 | 4,722 |
| 374938-99 | Drill | Burk Royalty Company | Jun 27, 1990 | Jul 5, 1990 | — | 4,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-25912 | — | — | — | — |
| — | — O-8-26174 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,283 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| T/Palo Pinto | 2,570 | -1,287 |
| T/Dog Bend LS | 2,824 | -1,541 |
| T/Upper Capps | 3,018 | -1,735 |
| T/Lower Strawn SD | 3,970 | -2,687 |
| Caddo | 4,190 | -2,907 |
| T/Caddo LS | 4,190 | -2,907 |
| Conglomerate | 4,598 | -3,315 |
| Barnett | 4,660 | -3,377 |
| MississippianMISS. | 4,684 | -3,401 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,970 | 3,980 | Perforated |
| 4,597 | 4,607 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 286 | 12.25 | 180 S |
| 4.5 | 4,700 | 7.875 | 350 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 21, 1991 | Apr 18, 1991 | Yes |
| 00 | May 6, 1991 | Aug 21, 1990 | Yes |
| 00 | Sep 19, 1990 | Aug 21, 1990 | Yes |
| 00 | Sep 14, 1990 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-447-35104 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-447-35104 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/44735104, documented in the API reference.