TEXAS · WELLS · THROCKMORTON COUNTY · LAMBSHEAD "F-1" LEASE · API 42-447-35557 · DISTRICT 6E

Lambshead F-1 #4S

Plugged

Throckmorton County · Paint Canyon (Cook) field  · Vertical

Lambshead F-1 #4S (API 42-447-35557) is a plugged well in Throckmorton County, plugged April 21, 2021, last operated by Daylight Petroleum LLC.

The RRC has issued one drilling permit (amended once), issued July 10, 1995, permitted to 2,000 ft.

It was permitted by L.C.S. Production Company and has since transferred to Daylight Petroleum LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Tannehill, Bluff Creek, Cook.

Its lease has reported 98.5K barrels of oil and 6 mcf of gas since June 1995, with no volume in the three years through April 2026. The lease carries 10 wells, so these are lease totals, not this well alone.

Operator of record

Daylight Petroleum LLC

Permitted by L.C.S. Production Company; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Apr 7, 2026
Permits on file
7
Phone
(281) 601-9288

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleDaylight Petroleum LLC
Production reportsDaylight Petroleum LLCthrough May 2017
Latest permitL.C.S. Production CompanyJul 10, 1995

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,000
total depth, ft
2
permits on file
Jul 10, 1995
last permit issued
Sep 19, 1995
completed
98.5K
cumulative oil, bbl
6
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 1995 THROUGH May 2017

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 19, 1995
Shut in
—
Plugged
Apr 21, 2021

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 10 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Lambshead "F-1" O-8-27615Paint Canyon (Cook)Daylight Petroleum LLC1098.5K6Jun 1995 – May 2017

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1L.C.S. Production CompanyJul 1995 → Feb 1998
  2. 2T-N-T Engineering, Inc.Mar 1998 → May 2016
  3. 3Avad Operating, LLCJul 2016 → May 2017

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
437552-98DrillL.C.S. Production CompanyOct 17, 1995Jul 10, 1995Aug 22, 19952,000
437552-99DrillL.C.S. Production CompanyJul 5, 1995Jul 10, 1995—2,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Sep 19, 1995Lambshead F-1 O-8-27615Paint Canyon (Cook)Daylight Petroleum LLCPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 1,498 ft elevation.Download CSV →

FormationMD ftSubsea
Tannehill958540
Bluff Creek1,240258
Cook1,350148

Perforations

Perforated and open-hole intervals.

FromToType
1,3561,360Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
5.51,4887.875250 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Nov 8, 1995Oct 12, 1995Yes
00Oct 26, 1995——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/44735557, documented in the API reference.