WELL · 42-447-35624 · DISTRICT 7

Anp -132- #1

N

Throckmorton County · Swenson -170- (Caddo Lower) field  · Vertical

Anp -132- #1 (API 42-447-35624) is a well in Throckmorton County operated by Mitchell Energy Corporation, completed June 3, 1996.

The RRC has issued one drilling permit (amended twice), issued April 25, 1996, permitted to 5,900 ft.

Completion filings report 2 formation tops, including Caddo, Ellenburger.

Its 2 leases have reported 130K barrels of oil and 967K mcf of gas since June 1996, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Mitchell Energy Corporation

Based in
Houston, TX
P-5 status
Inactive (I)
P-5 last filed
Jul 18, 2000
Permits on file
4,224
Phone
(713) 377-5818

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMitchell Energy Corporation
Production reportsTexxol Operating Company, Inc.through Apr 2026
Latest permitMitchell Energy CorporationApr 25, 1996

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,900
total depth, ft
3
permits on file
Apr 25, 1996
last permit issued
Jun 3, 1996
completed
130K
cumulative oil, bbl
967K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 1996 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 3, 1996
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Anp -132- Unit O-8-27959Swenson (Caddo)Texxol Operating Company, Inc.1130K967KAug 1996 – Jul 2026
Anp -132- O-8-27884Swenson -170- (Caddo, Lower)Mitchell Energy Corporation14500Jun 1996 – Aug 1997

Gas, mcf lease total

Last 12 months 23,013 · prior 12 24,455(-6%)

02K4K202420252026

Oil, barrels lease total

Last 12 months 505 · prior 12 935(-46%)

0200400202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Mitchell Energy CorporationJun 1996 → Mar 2000
  2. 2Richey, Ray Management Co., Inc.Apr 2000 → Jul 2013
  3. 3Texxol Operating Company, Inc.Aug 2013 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
447475-97DrillMitchell Energy CorporationJun 10, 1996Apr 25, 1996Apr 30, 19965,900
447475-98DrillMitchell Energy CorporationMay 1, 1996Apr 25, 1996—5,900
447475-99DrillMitchell Energy CorporationApr 25, 1996Apr 25, 1996—5,900

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-27884————
—— O-8-27959————

Formation tops

As filed on W-2/G-1. Subsea from 1,526 ft elevation.Download CSV →

FormationMD ftSubsea
Caddo4,760-3,234
Ellenburger5,542-4,016

Perforations

Perforated and open-hole intervals.

FromToType
4,7604,785Perforated
4,8024,847Perforated
4,9464,994Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62528112.25200 S
8.62528212.25200 S
4.55,7247.875450 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 10, 1997May 28, 1997—
00Oct 3, 1996——
00Sep 9, 1996Jul 2, 1996Yes
00Jul 23, 1996——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/44735624, documented in the API reference.