TEXAS · WELLS · THROCKMORTON COUNTY · WALTERS LEASE · API 42-447-35875 · DISTRICT 6E
Walters #1
Throckmorton County · Throckmorton County Regular field · Vertical
Walters #1 (API 42-447-35875) is a plugged well in Throckmorton County, plugged August 23, 2005, last operated by Stovall Operating CO..
The RRC has issued one drilling permit, issued June 30, 1998, permitted to 4,999 ft.
Completion filings report 2 formation tops, including Caddo, Mississippian.
Its lease has reported 14.3K barrels of oil since August 1998, with no volume in the three years through April 2026.
Operator of record
- Based in
- Graham, TX
- P-5 status
- Active (A)
- P-5 last filed
- Nov 25, 2025
- Permits on file
- 259
- Phone
- (940) 549-2616
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Stovall Operating Co. |
| Production reports | Stovall Operating Co.through Dec 2004 |
| Latest permit | Stovall Operating Co.Jun 30, 1998 |
- 4,999
- total depth, ft
- 1
- permits on file
- Jun 30, 1998
- last permit issued
- Aug 14, 1998
- completed
- 14.3K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 1998 THROUGH Dec 2004
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 14, 1998
- Shut in
- —
- Plugged
- Aug 23, 2005
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Walters O-8-28514 | Throckmorton County Regular | Stovall Operating Co. | 1 | 14.3K | 0 | Aug 1998 – Dec 2004 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Stovall Operating Co.Aug 1998 → Dec 2004
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 477459-99 | Drill | Stovall Operating Co. | Jun 26, 1998 | Jun 30, 1998 | Jul 20, 1998 | 4,999 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Aug 14, 1998 | Walters O-8-28514 | Throckmorton County Regular | Stovall Operating Co. | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,316 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| CaddoTOP CADDO | 4,080 | -2,764 |
| MississippianTOP MISSISSIPPI | 4,598 | -3,282 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,607 | 4,622 | Open hole |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 255 | 12.25 | 165 S |
| 5.5 | 4,607 | 7.875 | 126 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 9, 1998 | Aug 21, 1998 | Yes |
| 00 | Sep 2, 1998 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-447-35875 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-447-35875 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/44735875, documented in the API reference.