WELL · 42-447-35926 · DISTRICT 7
Anp 101 #1
Throckmorton County · Teir (Strawn Sand) field · Vertical
Anp 101 #1 (API 42-447-35926) is a plugged well in Throckmorton County, plugged March 10, 2020, last operated by Adexco Operating Company.
The RRC has issued 2 drilling permits between 1999 and 2000, permitted to 5,350 ft.
Completion filings report 5 formation tops, including Strawn, Teir Strawn, Tier Strawn, Lower Teir Strawn.
Its 2 leases have reported 57.5K barrels of oil and 26.2K mcf of gas since August 1999, last reporting in July 2020. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
- Based in
- Fort Worth, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Jul 18, 2023
- Permits on file
- 102
- Phone
- (817) 332-3891
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Adexco Operating Company |
| Production reports | Adexco Operating Companythrough Sep 2019 |
| Latest permit | Adexco Operating CompanyMay 9, 2000 |
- 5,350
- total depth, ft
- 2
- permits on file
- May 9, 2000
- last permit issued
- Jun 1, 2000
- completed
- 57.5K
- cumulative oil, bbl
- 26.2K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 1999 THROUGH Jul 2020
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 1, 2000
- Shut in
- —
- Plugged
- Mar 10, 2020
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Anp 101 O-8-28823 | Teir (Strawn Sand) | Adexco Operating Company | 1 | 50.5K | 23.1K | Jun 2000 – Jul 2020 |
| Anp 101 O-8-28644 | Swenson (Caddo) | Adexco Operating Company | 1 | 7.01K | 3.11K | Aug 1999 – Mar 2008 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Adexco Operating CompanyAug 1999 → Sep 2019
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 494664-99 | Recompletion | Adexco Operating Company | May 3, 2000 | May 9, 2000 | Jun 6, 2000 | 5,350 |
| 484151-99 | Drill | Adexco Operating Company | Apr 27, 1999 | May 3, 1999 | Jul 14, 1999 | 5,350 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-28644 | — | — | — | — |
| — | — O-8-28823 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,591 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,773 | 4,787 | Perforated |
| 4,932 | 4,974 | Perforated |
| 5,070 | 5,118 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 312 | 11 | 115 S |
| 4.5 | 5,249 | 7.875 | 275 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 3, 2000 | Jun 14, 2000 | Yes |
| 00 | Jun 30, 2000 | Aug 16, 1999 | Yes |
| 00 | Oct 8, 1999 | Aug 16, 1999 | Yes |
| 00 | Sep 28, 1999 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-447-35926 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-447-35926 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/44735926, documented in the API reference.