WELL · 42-449-30273 · DISTRICT 6

Talco Central West Unit #109

Plugged

Titus County · Talco field  · Vertical

Talco Central West Unit #109 (API 42-449-30273) is a plugged well in Titus County, plugged December 3, 2021, last operated by J.P. Oil Company Inc..

The RRC has issued one drilling permit, issued June 23, 1980, permitted to 5,000 ft.

It was permitted by Exxon Corp. and has since transferred to J.P. Oil Company Inc. on the wellbore schedule.

Its 2 leases have reported 852K barrels of oil and 22 mcf of gas since January 1993, last reporting in July 2026. The leases carry 36 wells, so these are lease totals, not this well alone.

Operator of record

J.P. Oil Company Inc.

Permitted by Exxon Corp.; the EWA schedule now lists a different operator.

Based in
Lafayette, LA
P-5 status
Active (A)
P-5 last filed
May 5, 2026
Phone
(337) 234-1170

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleJ.P. Oil Company Inc.
Production reportsJ.P. Oil Company, Inc.through Mar 2026
Latest permitExxon Corp.Jun 23, 1980

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,000
total depth, ft
1
permits on file
Jun 23, 1980
last permit issued
Jan 5, 1981
completed
852K
cumulative oil, bbl
22
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 5, 1981
Shut in
—
Plugged
Dec 3, 2021

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 36 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Talco Central West Unit O-6-15127TalcoJ.P. Oil Company, Inc.31670K0Dec 2012 – Jul 2026
King,a.p. a/C #3 O-6-1678TalcoExxon Mobil Corporation5181K22Jan 1993 – Mar 2013

Oil, barrels lease total

Last 12 months 25,076 · prior 12 23,064(+9%)

01K2K3K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Jan 1993 → Mar 2000
  2. 2Exxon Mobil CorporationApr 2000 → Dec 2013
  3. 3XTO Energy Inc.Jan 2014 → Oct 2023
  4. 4J.P. Oil Company, Inc.Nov 2023 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
85124-99DrillExxon Corp.Jun 23, 1980Jun 23, 1980Dec 7, 19805,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-6-1678————
—— O-6-15127————

Perforations

Perforated and open-hole intervals.

FromToType
4,2764,286Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62550911266 S
2.8754,030——
5.54,4907.875644 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 16, 2012Jan 28, 1981—
00Jan 12, 1984Jan 28, 1981—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/44930273, documented in the API reference.