TEXAS · WELLS · TITUS COUNTY · TALCO PALUXY /CARRSAND/ UNIT NO1 LEASE · API 42-449-30452 · DISTRICT 06

Talco Paluxy /Carrsand/ Unit NO1 #114I

Plugged

Titus County · Talco field  · Vertical

Talco Paluxy /Carrsand/ Unit No1 #114I (API 42-449-30452) is a plugged well in Titus County, plugged November 13, 1996, last operated by Exxon Mobil Corporation.

The RRC has issued one drilling permit, issued August 26, 1985, permitted to 4,950 ft.

It was permitted by Exxon Corp. and has since transferred to Exxon Mobil Corporation on the wellbore schedule.

Completion filings report 5 formation tops, including Eagle Ford, Woodbine, Washita, Frederickburg.

Its lease has reported 911K barrels of oil and 22 mcf of gas since January 1993, last reporting in July 2013. The lease carries 60 wells, so these are lease totals, not this well alone.

Operator of record

Exxon Mobil Corporation

Permitted by Exxon Corp.; the EWA schedule now lists a different operator.

Based in
Spring, TX
P-5 status
Active (A)
P-5 last filed
Jul 15, 2026
Permits on file
1,223
Phone
(346) 474-9142

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleExxon Mobil Corporation
Production reportsExxon Mobil Corporationthrough Nov 2012
Latest permitExxon Corp.Aug 26, 1985

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,950
total depth, ft
1
permits on file
Aug 26, 1985
last permit issued
Aug 25, 1992
completed
911K
cumulative oil, bbl
22
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2013

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 25, 1992
Shut in
—
Plugged
Nov 13, 1996

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 60 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Talco Paluxy /Carrsand/ Unit NO1 O-6-5150TalcoExxon Mobil Corporation60911K22Jan 1993 – Jul 2013

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Jan 1993 → Mar 2000
  2. 2Exxon Mobil CorporationApr 2000 → Nov 2012

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
283343-99DrillExxon Corp.Aug 26, 1985Aug 26, 1985—4,950

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 25, 1992Talco Paluxy /Carrsand/ Unit NO1 O-6-5150TalcoExxon Mobil CorporationPlugged—

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Eagle FordEAGLEFORD2,504
Woodbine2,886
Washita3,465
Frederickburg4,043
Goodland4,211

Perforations

Perforated and open-hole intervals.

FromToType
4,2164,226Perforated
4,2304,239Perforated
4,2444,266Perforated
4,2724,279Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.7510220300 S
74,4499.625603 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 28, 1992Sep 25, 1992—
00Apr 7, 1992Mar 9, 1992—
00Apr 27, 1990Feb 8, 1990—
00Mar 20, 1986Jan 17, 1986Yes
00Mar 19, 1986——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
4.25M
bbl, all reported
Jun 1997
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000058092H-1 InjectionPlugged Nov 20, 1996004,150–0

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 31,915(-100%)

05K10K19961997

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/44930452, documented in the API reference.