TEXAS · WELLS · TITUS COUNTY · API 42-449-30496 · DISTRICT 06

Talco East Unit #8

Shut in

Titus County · Talco field · Shut In  · Vertical

Talco East Unit #8 (API 42-449-30496) is a well in Titus County operated by J.P. Oil Company Inc., completed September 2, 1988 and listed as shut in on the RRC schedule, shut in September 1, 2010.

The RRC has issued one drilling permit, issued July 14, 1988, permitted to 4,420 ft.

It was permitted by Exxon Corp. and has since transferred to J.P. Oil Company Inc. on the wellbore schedule.

Completion filings report 6 formation tops, including Pecan Gap, Blossom, Eagle Ford, Washita.

Its 2 leases have reported 3.01M barrels of oil and 23 mcf of gas since January 1993, last reporting in July 2026. The leases carry 136 wells, so these are lease totals, not this well alone.

Operator of record

J.P. Oil Company Inc.

Permitted by Exxon Corp.; the EWA schedule now lists a different operator.

Based in
Lafayette, LA
P-5 status
Active (A)
P-5 last filed
May 5, 2026
Phone
(337) 234-1170

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleExxon Mobil Corporation
Production reportsJ.P. Oil Company, Inc.through Mar 2026
Latest permitExxon Corp.Jul 14, 1988

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,420
total depth, ft
1
permits on file
Jul 14, 1988
last permit issued
Sep 2, 1988
completed
3.01M
cumulative oil, bbl
23
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Sep 2, 1988
Shut in
Sep 1, 2010
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 136 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Talco East Unit O-6-15058TalcoJ.P. Oil Company, Inc.1292.62M0Feb 2012 – Jul 2026
Blalock, Sallie O-6-1661TalcoExxon Mobil Corporation7393K23Jan 1993 – Jun 2012

Oil, barrels lease total

Last 12 months 103,778 · prior 12 123,839(-16%)

05K10K15K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Jan 1993 → Mar 2000
  2. 2Exxon Mobil CorporationApr 2000 → Dec 2013
  3. 3XTO Energy Inc.Jan 2014 → Oct 2023
  4. 4J.P. Oil Company, Inc.Nov 2023 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
348015-99DrillExxon Corp.Jun 20, 1988Jul 14, 1988—4,420

Completions

CompletedLeaseFieldOperatorStatusDepth
Sep 2, 1988Talco East Unit O-6-15058TalcoJ.P. Oil Company Inc.Shut In · shut in Sep 1, 20104,420
Sep 2, 1988Blalock Sallie O-6-1661TalcoExxon Mobil CorporationNot on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 357 ft elevation.Download CSV →

FormationMD ftSubsea
Pecan Gap1,763-1,406
Blossom2,720-2,363
Eagle FordEAGLEFORD3,070-2,713
Washita3,493-3,136
Goodland4,240-3,883
Paluxy4,280-3,923

Perforations

Perforated and open-hole intervals.

FromToType
4,2784,286Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.7512514.75115 S
74,4059.8751,254 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 31, 2012Sep 27, 1988Yes
00Oct 18, 1988Sep 27, 1988Yes
00Oct 13, 1988——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/44930496, documented in the API reference.