TEXAS · WELLS · TITUS COUNTY · API 42-449-30497 · DISTRICT 06

Talco Central East Unit #1

Y

Titus County · Talco field · Producing  · Vertical

Talco Central East Unit #1 (API 42-449-30497) is a well in Titus County operated by J.P. Oil Company Inc., completed November 2, 2012 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued July 14, 1988, permitted to 4,436 ft.

It was permitted by Exxon Corp. and has since transferred to J.P. Oil Company Inc. on the wellbore schedule.

Completion filings report 6 formation tops, including Nacatosh, Eagle Ford, Woodbine, Washita.

Its 2 leases have reported 643K barrels of oil since January 1993, last reporting in July 2026. The leases carry 48 wells, so these are lease totals, not this well alone.

Operator of record

J.P. Oil Company Inc.

Permitted by Exxon Corp.; the EWA schedule now lists a different operator.

Based in
Lafayette, LA
P-5 status
Active (A)
P-5 last filed
May 5, 2026
Phone
(337) 234-1170

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleJ.P. Oil Company Inc.
Production reportsJ.P. Oil Company, Inc.through Mar 2026
Latest permitExxon Corp.Jul 14, 1988

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,436
total depth, ft
1
permits on file
Jul 14, 1988
last permit issued
Nov 2, 2012
completed
643K
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 2, 2012
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 48 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Talco Central East Unit O-6-15232TalcoJ.P. Oil Company, Inc.47640K0Feb 2014 – Jul 2026
Galt, Myra O U #2 O-6-12461TalcoXTO Energy Inc.12.76K0Jan 1993 – Feb 2014

Oil, barrels lease total

Last 12 months 33,610 · prior 12 35,657(-6%)

02K4K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Mobil CorporationNov 2012 → Dec 2013
  2. 2XTO Energy Inc.Feb 2014 → Oct 2023
  3. 3J.P. Oil Company, Inc.Nov 2023 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
348854-99DrillExxon Corp.Jul 14, 1988Jul 14, 1988—4,440

Completions

CompletedLeaseFieldOperatorStatusDepth
Nov 2, 2012Talco Central East Unit O-6-15232TalcoJ.P. Oil Company Inc.Producing4,436
Nov 2, 2012Galt Myra O U #2 O-6-12461TalcoXTO Energy Inc.Not on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 367 ft elevation.Download CSV →

FormationMD ftSubsea
Nacatosh890-523
Eagle Ford2,496-2,129
Eagle FordEAGLEFORD2,496-2,129
Woodbine2,881-2,514
Washita3,452-3,085
GoodlandGOODLAND LIMESTONE4,182-3,815
Paluxy4,230-3,863

Perforations

Perforated and open-hole intervals.

FromToType
4,2124,218Perforated
4,2264,232Perforated
4,2284,234Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.7512214.75115 S
74,4369.8751,250 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 29, 2014Nov 30, 2012—
00Apr 9, 2013Nov 30, 2012—
00Nov 29, 1988Oct 26, 1988Yes
00Nov 15, 1988——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/44930497, documented in the API reference.