TEXAS · WELLS · TOM GREEN COUNTY · GREEN, J. WILEY "B" LEASE · API 42-451-00810 · DISTRICT 6E

Green J. Wiley B #18

Plugged

Tom Green County · Susan Peak (Cisco Canyon) field  · Vertical

Green J. Wiley B #18 (API 42-451-00810) is a plugged well in Tom Green County, plugged December 13, 1994, last operated by Compass Operating L.L.C..

The RRC has issued one drilling permit, issued May 5, 1978, permitted to 4,590 ft.

It was permitted by Marathon Oil Company and has since transferred to Compass Operating L.L.C. on the wellbore schedule.

Its lease has reported 47.6K barrels of oil and 226K mcf of gas since January 1993, with no volume in the three years through April 2026. The lease carries 11 wells, so these are lease totals, not this well alone.

Operator of record

Compass Operating L.L.C.

Permitted by Marathon Oil Company; the EWA schedule now lists a different operator.

Based in
Midland, TX
P-5 status
Delinquent (D)
P-5 last filed
Sep 29, 2025
Permits on file
15
Phone
(432) 688-4088

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCompass Operating L.L.C.
Production reportsCompass Operating, L.L.C.through Dec 2017
Latest permitMarathon Oil CompanyMay 5, 1978

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,590
total depth, ft
1
permits on file
May 5, 1978
last permit issued
May 5, 1978
completed
47.6K
cumulative oil, bbl
226K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Dec 2017

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 5, 1978
Shut in
—
Plugged
Dec 13, 1994

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 11 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Green, J. Wiley "B" O-9-1970Susan Peak (Cisco Canyon)Compass Operating, L.L.C.1147.6K226KJan 1993 – Dec 2017

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Marathon Oil CompanyJan 1993 → Oct 1994
  2. 2Costilla Petroleum CorporationNov 1994 → Jan 1997
  3. 3Costilla Energy, Inc.Feb 1997 → Jul 2000
  4. 4Cinco Resources Operating,l.l.c.Aug 2000 → Sep 2000
  5. 5Compass Operating, L.L.C.Oct 2000 → Dec 2017

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
23610-99RecompletionMarathon Oil CompanyMay 5, 1978May 5, 1978—4,590

Completions

CompletedLeaseFieldOperatorStatusDepth
May 5, 1978Green J. Wiley B O-9-1970Susan Peak (Cisco Canyon)Compass Operating L.L.C.Plugged—
—Green J. Wiley -B- O-9-1977Susan Peak (Strawn Upper)Marathon Oil CompanyPlugged—

Perforations

Perforated and open-hole intervals.

FromToType
4,3054,331Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62524811150 S
2.3754,260——
5.54,7547.375300 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jan 12, 1984Jul 3, 1978—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/45100810, documented in the API reference.